|
Bids Are invited for Operation And Maintenance Power House / Power Plant - Routine, Preventive And Breakdown Maintenance Of Milling System And Breakdown Maintenance Work Pc Purge Pipes Of Unit 4 And 5 Of 2X500 Mw, Btps, Anpara - Routine & Preventive Maintenance Of Raw Coal Feeder And Seal Air Fans. , Routine & Preventive Maintenance Of Ball Mills And Their Lubricating System. , Unloading Of Steel Ball At Site From The Trucks And Charging In The Ball Mills Through The System. , Unloading Of Steel Balls At Site From The Trucks And Charging In The Ball Mills Through Man Hole/ Trunion Tube. , Collecting Scrap Material And Drums From Bmd-Ii, Btps Site Scrap Yard, Picking/Stacking It Category Wise E.G. M.S., S.S., C.I., Alloy Steel, Mixed Steel And Empty Steel Ball Drum, Old & Used S.Tak 40, Off Size Grinding Media Steel Ball Drum Etc. Then Transportation From Site Scrap Yard To Central Scrap Yard By Tractor Trolley/Truck, Hydra For Loading/ Unloading Of Heavy Scrap Material. Tractor Trolley/ Truck, Hydra Shall Be Provided For The Transportation Purpose By The Nigam Free Of Cost. , Attending Fault Of Coc Including Rectification/ Joining Of The Coc (Clean Out Conveyor )Chain. , Removal Of Foreign Material E.G. Bunker Grating, Steel Plate, Stare Cases, Impregnated Rubber Pads Etc By Cutting Pulling From R C Feeder Body/Centre Pipe Of Ball Mill , Cleaning Of Various Grills, Platform, Stairs And Hand Railing Of Boiler From ‘O Meter To ‘15Meter (Thrice A Week Unit4#156, Unit5#156) , Cleaning Of Various Grills, Platform, Stairs And Hand Railing Of Boiler From ‘15Meter To ‘22Meter (Thrice A Week Unit4#156, Unit5#156) , Cleaning Of Various Grills, Platform, Stairs And Hand Railing Of Boiler From ‘22Meter To ‘35Meter (Thrice A Week Unit4#156, Unit5#156) , Cleaning Of Various Grills, Platform, Stairs And Hand Railing Of Boiler From ‘35Meter To ‘49Meter (Thrice A Week Unit4#156, Unit5#156) , Cleaning Of Various Grills, Platform, Stairs And Hand Railing Of Boiler From ‘49Meter To ‘57Meter (Thrice A Week Unit4#156, Unit5#156) , Cleaning Of Various Grills, Platform, Stairs And Hand Railing Of Boiler From ‘57Meter To ‘75Meter (Thrice A Week Unit4#156, Unit5#156) , Cleaning Of Entire Coal Pipe From Outlet Of Mills To Boiler (Thrice A Week Unit4#156, Unit5#156) , Cleaning Of Dust Bin Of Boiler Are (Thrice A Week Unit4#104, Unit5#104) , Cleaning And Water Washing Of Area ‘O Meter From H Row To Wall Along Esp Hopper Area (North Side) (Daily Unit4#365, Unit5#365) , Cleaning And Water Washing Of Boiler Area From Drain Along Esp Hopper (North Side) To Facing Beyond Chimney. (Daily Unit4#365, Unit5#365) , Cleaning And Water Washing Of Floor Around The Scrapper Conveyor (H To K Row) (Daily Unit4#365, Unit5#365) , Cleaning Of Complete 15 Meter Area Rc Feeder Floor. (Daily Unit4#365, Unit5#365) , Cleaning Of Ball Mill Platform And ‘O Meter Floor Including The Removal Of Oil Grease Etc. (Daily Unit4#365, Unit5#365) , Cleaning And Water Washing Of Boiler Area Beyond Unit No.#5 Mill And Ssc Area Up To Fencing Including Material/Scrap Yard Up To F.O.P.Around Chimney. (Daily Unit4#0, Unit5#365) , Cleaning And Water Washing Of Boiler Area Between Unit No. 4&5 Including Row From Cpp Building Up To Around Chimney. (Daily Unit4#365, Unit5#0) , Cleaning And Water Washing Of Boiler Area (West Side) From Column 3 To The Area Up To The Conveyor 05A/B From H Row To The Ash Slurry Pump House (Only Cemented Floor. (Daily Unit4#365, Unit5#0) , Cleaning Of All Cable Tray Hot & Cold Air Duct And Related Structure At ‘O Meter Level To R.C. Feeder Floor Of Mill Site (From A To H Mill)
|