|
Construction Of A Primary School Building In Rzeszotary - Stage I In The Scope Of Finishing Works. The Subject Of The Order Is The Execution Of Finishing Construction Works Constituting A Continuation Of The Investment Entitled Construction Of A Primary School Building In Rzeszotary - Stage I. So Far, The Shell And Shell Of A Three-Story Building With A Usable Area Of 2,319.10 M² Has Been Completed. This Procedure Covers The Performance Of Further Works Necessary To Complete The First Stage Covered By The Design Documentation, In Particular: Demolition Works Regarding The Existing Boiler Room, Finishing And Supplementary Construction Works Inside The Building (Walls, Plasters, Doors And Windows, Floors, Suspended Ceilings, Cladding And Painting Works, Balustrades And Handrails And Equipment), Facade Works, Works Related To Land Development (Paved Surfaces, Fencing, Greenery, Shed, Small Architecture), Works In The Field Of Sanitary Installations (Water Supply And Fire Protection Installations, Sanitary And Rainwater Sewage, Central Heating Installation, Gas Installations, Ventilation, Air Conditioning And Container Boiler Room), Works In The Field Of Electrical Installations (Internal Power Lines And Cable Routes, Switchboards, Plug-In Sockets And Lighting Installations, Paging System, Alarm, Logic, Monitoring And Access Control Installations, Sound Systems, Ventilation And Heating Installations, Equalizing Connections, Charging Station And Gate And Wicket Drives). A Detailed Description Is Included In The Swz And Design Documentation.
|