In The Subject Order, Renovation Works Of The Feeding Block Should Be Carried Out In Building B Of Primary School No. 340. It Is Necessary To Replace The Electrical And Sanitary Installations, Ventilation, Renovate Walls And Floors, And Install Kitchen Equipment. The Scope Of The Order Covers The Entire Technical Project For The Renovation Of The Premises Of The Catering Block And The Dining Room In All Industries. Renovation Works In The Catering Block Should Be Carried Out Based On The Prepared Technical Design Of Catering Technology (Attached To The Specification) For The Kitchen Serving Meals In The Primary School Intended For 200 People. Scope Of The Order: List Of Works Covered By The Subject Of The Order: - Preparatory And Security Works - Tight Separation Of The Area For Renovation Works Due To The Active Part Of The Facility; - Dismantling Works - Disconnection From The Installation, Disassembly Of Kitchen Equipment Along With Removal And Protection, And Reassembly Of Selected Equipment After Consultation With The Facility, Disassembly Of Equipment Elements, I.E. Soap Dispensers, Dryers, Handles, Etc., Disassembly And Reassembly After Adapting The Passage For A New Floor Drain; - Insulation Works - Damp And Waterproof Insulation, Additional Sealing Of Damp And Wet Rooms; - Laying Floor Layers - Laying Layers Of Foil, Insulation, Making A Cement Floor, Making Slopes To Sewage Grates; - Making Casings For Installation Shafts - Demolition Of Existing Ones, Covering All Installation Pipes With Plasterboards And Installation Inspection Doors And Ventilation Grilles, Applying Finishing Layers; - Replacing Wall And Floor Coverings - Removing Existing Tiles, Priming The Surfaces And Making Insulation, Ceramic Linings, Laying Finishing Aluminum Strips, Grouting; - Replacing The Entire Sanitary And Electrical Installation - Digging Furrows, Replacing The Installation, Casing / Filling, Installing All New Equipment - Switchboards, Flush-Mounted Sockets, Fixtures Lighting, Evacuation And Emergency Lighting, Etc.; - Replacement With Widening Doors And Installing New Lintels - Forging Jambs, Widening Openings, Installing New Aluminum Joinery; - Wall Repairs Including Plastering And Painting - Scraping Off Old Paint, Repairing The Substrate, Preparing The Substrate In Accordance With The Manufacturers Recommendation For Painting With Latex And Hydrophobic Paints For Wet Rooms; - Ceiling Construction In The Form Of A Hygienic Coffered Ceiling For Wet Rooms Such As The Kitchen In Accordance With The Manufacturers Recommendations; - Installation Of A Mechanical Ventilation System; - Delivery And Installation Of New Fittings, Sanitary Devices, Catering Equipment, - Performance Of Tightness Tests Of The Water Supply System Before Covering The Cracks And Applying Cladding; - Separation Of A Room In The Basement For A Grease Separator And Installation Of The Device; - Ventilation Testing; - Performance Of Electrical Measurements; - Preparation Of Complete As-
|