Architectural, Construction, Engineering And Inspection Services – Mindener Parkhaus Gmbh - New Marienwall Parking Garage. The Subject Of The Order Is The Services And Performance Profiles Of The Hoai For The Following Planning Services To A General Planner: - Object Planning For Buildings In Accordance With §§ 33 Ff. Hoai, Service Phases 1 To 9 - Specialist Planning Of The Structural Planning In Accordance With §§ 49 Ff. Hoai, Service Phases 1 To 6 - Specialist Planning Of The Technical Equipment In Accordance With §§ 53 Ff. Hoai, Service Phases 1 To 9 - Object Planning For Outdoor Facilities In Accordance With §§ 38 Ff. Hoai Including Required Engineering Structures In Accordance With § 41 Ff Hoai And Traffic Facilities In Accordance With § 45 Ff. Hoai Service Phases 1 To 9 - Building Acoustics (Sound Insulation) In Accordance With Appendix 1.2.4, Service Phases 1 To 8 As Well As Sound Insulation Reports - Fire Protection In Accordance With Aho Publication Series No. 17, Service Phases 1 To 8 - Light Reports For The Exterior And Interior Of The Scope - Project Organization The Plan Is To Create A Construction Design Document And Then Create A Functional Service Description For A Subsequent General Contractor Assignment. Service Phases 1 - 3 - Basic Determination, Preliminary Planning And Draft Planning With Regard To The Planning Services, All Partial Services Of Service Phases 1 - 3 Must Be Provided. Since The System-Related Construction Types Are Not Yet Known, Preliminary Statics Must Be Created With Regard To The Specialist Structural Planning, On The Basis Of Which The General Contractor (Gu) Creates The Statics For His Construction Type, Provided The Construction Type Is Left Open. Service Phase 4 - Approval Planning The Approval Planning Should Be Created By The General Planner. Service Phase 5 - Implementation Planning The Implementation Planning Is Generally Carried Out By The General Contractor Commissioned To Build The Parking Garage. After The Commissioning, The General Contractor (Gu) Creates The Work And Detailed Planning Of All Planning Areas (Building Construction, Statics, Tga, Etc.) To The Requested Or Necessary Extent. In Doing So, He Basically Takes Over The Design Planning On Which The Commission Is Based And Adapts It To The System He Offers. For This Reason, The Design Should Leave Room For The System-Related Design Differences In Order To Avoid Problems That Cannot Be Solved In This Regard. The General Contractor, As The Work Planner And At The Same Time The Executing Construction Company, Is Fully Responsible For The Technically Correct And Standard-Compliant Execution. It Is Therefore Not Necessary To Commission The Basic Services Of Service Phase 5 With The Exception Of Updating The Schedule In Accordance With The Service Profile According To Hoai. Instead, A Functional Service Description (Flb) Is A Special Service. The Flb Is Created On The Basis Of The Draft Planning. Since Every General Contractor Plans With Different Component Structures, Line Routings, Detailed Designs, Etc. Depending On The Type Of Construction, The Desired Function And Quality Are Included In The Functional Service Description
Contact Information
Address
Simeonscarre 2
Contact No.
051122007423
Email
vergabestelle@bbt-kanzlei.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112971290
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.