|
Structural Shell Work – Extended Shell - Existing. Three Separate 2-Story Existing Buildings With Pitched Roofs, Each With 228 Square Meters (Detention Building), 1,004 Square Meters (Exercise Hall) And 72 Square Meters (Latrine) Of Usable Space, Are To Be Gutted And Converted As Part Of A Thorough Renovation. This Includes Dismantling Measures With Some Pollution, The Production Of New Floor Slabs, The Renovation Of Exposed Brick Facades And The Construction Of New Roof Trusses. Title 01 Demolition Work And Disposal Work 00 Construction Site Equipment Clearing Approx. 320M² Of Construction Site (Vegetation, Bicycle Racks, Etc.) Dismantling Approx. 500M² Of Small Paving Stones Creating A Demolition And Disposal Concept. 01 Remediation Of Harmful Substances Asbestos, Kmf, Pah, Lindane 02 Detention Building Removal Of Approx. 1,100 M² Of Wallpaper And Plaster, Approx. 50 M² Of Tiles And Approx. 240 M² Of Floor Coverings. Dismantling Of Approx. 27 Windows, Approx. 21 Doors, Built-In Elements, 20 M² Of Dismantling Of The Entire Hipped Roof With Approx. 4.5T Roof Construction 03 Parade Hall Removal Of Approx. 1,400 M² Of Wallpaper And Plaster, Approx. 30 M² Of Tiles And Approx. 1,000 M² Of Floor Coverings. Dismantling Of Approx. 47 Windows, Approx. 21 Doors, Built-In Elements, Approx Of The Steel Parts Of The Polonceau Girders 04 Latrine Removal Of Approx. 130 M² Of Wallpaper, Approx. 140 M² Of Plaster, Approx. 15 M² Of Tiles And Approx. 80 M² Of Floor Coverings Dismantling Of 16 Windows, 7 Doors, Built-In Elements, Approx Avv Key Numbers, As Well As Proper, Sorted Recording And Disposal Of The Same. Approximately 2,182 T Of Non-Contaminated And Approximately 623 T Of Contaminated Building Rubble. Title 02 Earthworks And Shell Construction Work 01 Shoring Work, Drill Hall: Approx. 206 Sqm Of Support Pile Walls, Work Cycles 1-3 In The Pilgrimage Process 02 Earthworks, Drill Hall: 1,264 M³ Loosening Soil Inside + Outside Building Detention Building: 115 M³ Loosening Soil Inside + Outside Building Latrine: 48 M³ Loosening Soil Inside + Outside Building 03 Concrete And Reinforced Concrete Work Drill Hall: 776 Sqm Floor Slab D=25 Cm, 98 M³ Strip Foundations, 840 Sqm Clean Layer, 700 Sqm Horizontal Perimeter Insulation, 380 Sqm Vertical Perimeter Insulation 523 Sqm Filigree Ceilings D=18 Cm, 100 M³ Concrete Ceilings, 8 Prefabricated Stairs, 59 T B500b Reinforcing Bars Prison Building: 118 Sqm Floor Slab D = 25 Cm, 2 Cbm Strip Foundations, 118 Sqm Cleanliness Layer, 118 Sqm Horizontal Perimeter Insulation, 7 Sqm In-Situ Concrete Ceiling D = 25 Cm, 11 Sqm Concrete Wall D = 25 Cm, 4 T Rebar B500b Latrine: 41 Sqm Floor Slab D = 25 Cm, 2 Cbm Strip Foundations, 41 Sqm Cleanliness Layer, 41 Sqm Horizontal Perimeter Insulation, 1 T Rebar Steel B500b 04 Masonry Work Drill Hall: 758 Sqm Walls D=17.5 Cm, 104 Sqm Walls D=24 Cm, 30 Sqm Walls D=30 Cm, 33 Sqm Flat Bricks D=20Cm Detention Building: 5 Sqm Walls D=11.5 Cm, 0.5 T Steel Beam For Masonry Underpinning Stairwell Wall, Latrine: 12 Sqm Walls D=17.5-24 Cm Title 03 Brick Renovation 00 Construction Site Installation
|