1. The Scope Of Works Includes: 1.1. Road Works, Including: - Cost Of Adjustments To General Requirements (Cost Of Adapting To The General Requirements Of The Contract And General Requirements Contained In The Technical Specifications, Development Of A Temporary Traffic Organization Project, Installation And Dismantling Of Tor, Industry Supervision, Laboratory Services), - Surveying Works (Measurement Works, Post-Construction Geodetic Inventory, Electronic Road Update (Ediom), Change Of Land Use, Resumption/Transfer Of Geodetic Network Signs, - Demolition Of Road And Street Elements, Fences, - Removal Of Trees And Bushes, - Earthworks (Removal Of The Topsoil Layer, Excavations, Embankments), - Construction Of Asphalt Concrete Roadways With Structural Layers, - Construction Of Sidewalks Made Of Concrete Paving Stones With Structural Layers, - Construction Of A Ddr Bicycle Path Made Of Asphalt Concrete Along With Structural Layers, - Construction Of Sidewalks On Exits Made Of Concrete Paving Stones Along With Construction Layers, - Construction Of Exits Made Of Concrete Paving Stones With Construction Layers, - Concrete And Stone Curbs, Concrete Edges, - Vertical And Horizontal Markings, - Installation Of Road Safety Devices, - Greenery (Topsoil, Planting Low Greenery), - Strengthening Of Slopes And The Bottom Of Ditches, Inclusion Of Drains, - Culverts, - Installation Of Information Board About Co-Financing.1.2 Rainwater, Including: • Preparatory Works (Measurement Works), • Earthworks, • Assembly Works (Canals Made Of 200 Mm And 315 Mm Pipes, Inspection Wells, Sewage Wells), • Acceptance Works (Tele-Inspection, Water Tests Of Sewer Tightness, Regulation Of Wells). - Sanitary Sewage System, Including: • Renovation Of Collectors And Wells, • Regulation Of Wells, • Acceptance Works (Tele-Inspection). - Gas Pipeline In Including:• Preparatory Works (Measurement Works),• Earthworks,• Assembly Works (Installation Of 160 Mm, 90 Mm Pipelines, 250 Mm Pe Casing Pipes, 110 Mm Pvc, Fittings, Spacer Skids, Cuffs, Marking Of The Gas Pipeline Route), • Acceptance Works (Tightness Tests Of Gas Pipelines). - Street Lighting, Including: • Cable Line With Accompanying Works, • Installation Of Poles Anodized Aluminum Lighting And Lighting Fixtures Along With Accompanying Works, • Measurement Works. - Reconstruction Of Mv And Lv Power Networks, Including: • Reconstruction Of The Power Grid Along With Accompanying Works, - Construction Of A Technological Channel, Including: • Construction Of Ktu And Ktp Cable Ducts Along With Wells And Associated Works. - Reconstruction And Protection Of Telecommunications Infrastructure, Including: • Reconstruction Of The Pipeline Along With Associated Works, • Reconstruction Fiber Optic Cables Along With Accompanying Works, • Reconstruction Of The Above-Ground Network Along With Accompanying Works. A Detailed Description Of The Order And The Method Of Its Implementation Are Specified In The Bid Cost Estimate And Design Documentation
|