1. The Subject Of The Order Is: Renovation Of Bridge Structures No. Jni 01024236 And Jni 01024232A) Execution Of A Comprehensive Renovation Of The Wooden Bridge No. Jni 01024236 Along The District Road No. 1210 R Korczowiska - Mazury In The Scope Of: - Complete Replacement Of The Wooden Structure Of The Structure - Anti-Corrosion Protection Of The Steel Structure - Filling In The Missing Connectors Of The Crossbar Connections With Main Beams Of The Bridge - Maintenance Of The Facilitys Bearings - Renovation Of The External Surfaces Of The Bridge Supports, Along With Cleaning Of Dirt And Plants And Conservation Of Concrete With Manually Applied Pcc Mortars. Replacement Of The Wooden Structure Includes: A) Disassembly Of The Existing Structure, Including: - Disassembly Of The Double Wooden Deck Of The Bridge Road - Dismantling Of Wooden Crossbars - Dismantling Of Sidewalks, Including Boards, Longitudinal Beam And Transverse Beams - Dismantling Of Wooden Balustrades B) Assembly Of A New Wooden Structure Of The Bridge, Including: - Assembly Of Wooden Cross-Sections - Assembly Of The Lower Deck Made Of Thick Logs - Assembly Of The Upper Deck Made Of Thick Boards - Assembly Of Bridge Walkway Elements (Longitudinal Beam, Derivative Cross Beams, Plank Surface) C) Assembly Of Balustrades, Including: - Installation Of Balustrade Posts - Installation Of Wooden Drafts - Installation Of Balustrade Handrails Scope Of Works In Accordance With The Bill Of Quantities, Design Documentation And Technical Specifications For The Execution And Acceptance Of Construction Works. When Calculating The Offer Price, The Contractor Must Calculate The Works Related To The Comprehensive Renovation Of The Bridge And Take Into Account Works Not Included In The Bill Of Quantities, But Necessary For The Execution Of The Order - Unforeseen Works That Were Revealed During The Implementation Of The Task. B) Renovation Of The Wooden Bridge No. Jni 01024232 Along The District Road No. 1206 R Wola Rańczyowska Through Wieś In The Scope Of: - Demolition Of The Wooden Bridge - Over The Water - Filling In The Missing Screws Of The Steel Crossbar Connections, - Maintenance Of The Bridge Bearing Sheets - Construction Of A Complete Wooden Bridge Made Of C27 Class Wood - Over The Water, Along With Assembly Elements And Insulation Of The Crossbars (Crossbars, Beams Edge Beams, Upper Plank, Lower Plank, Posts, Handrails, Drafts) Along With Attaching The Crossbars To The Girders With Clamps, And Connecting Wooden Elements With Screws And Nails To Ensure Durability And Stability Of The Structure. Wooden Crossbeams Protected Against Corrosion By Attaching Roofing Felt On The Top And Side Sides. Scope Of Works In Accordance With The Bill Of Quantities, Design Documentation And Technical Specifications For The Execution And Acceptance Of Construction Works. When Calculating The Offer Price, The Contractor Must Calculate The Works Related To The Comprehensive Renovation Of The Bridge And Take Into Acco
Contact Information
Address
Zarząd Dróg Powiatowych W Kolbuszowej,Kolbuszowa,36-100,Podkarpackie,Pl823 - Rzeszowski
Email
zdp@kolbuszowski.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112930159
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.