Works For Complete Or Part Construction And Civil Engineering Work – Brunnthal Primary School Extension. Project Description: The Expansion Of The Primary School Is Planned For The Community Of Brunnthal. The Primary School Consists Of Several Buildings That Were Built In Several Phases. Since The School Is Located On A Narrow Site In The Village Area, Attempts Are Made To Build On As Little Additional Space As Possible, Which In Turn Leads To Reduced Outdoor Space. In Addition, The Static Conditions Of The Existing Buildings Must Be Taken Into Account. The Project Is Divided Into Two Construction Phases. Structure Of Structural Measures: North Component: The Northern Development In The Area Of The Main Entrance To The School. Intermediate Building: The Junction Of The Existing Buildings Is Carried Out Through Dismantling And New Construction. Inner Courtyard Component: Lateral Extension In The Inner Courtyard Area. South Component – Building “C”: Renovation Work In The Existing Building. Explanation Of The North Component: Basement: In The New Building, A Boiler Room And A Pellet Bunker Are Being Built In Reinforced Concrete. In The Existing Building, Windows Will Be Bricked Up For Fire Protection Reasons, The Pottery Kiln Room Will Be Adapted And The Existing Boiler Room Will Be Dismantled To Create Barrier-Free Access. This Requires New Fire Protection Walls, Doors And A New Floor Structure. In Addition, The Ventilation In The Hallway Is Being Supplemented, Which Is Why The Suspended Ceiling Needs To Be Replaced. Ground Floor: In The New Building, New Areas Are Being Created For The Secretariat As Well As The Directors And Vice-Principals Offices. Load-Bearing Walls Are Predominantly Constructed Using Solid Wood Construction, Supplemented By Reinforced Concrete And Drywall. Windows And Doors Are Made Of Wood And Aluminum Or Highly Insulated Metal Structures. In The Existing Classrooms, Drywall Walls Will Be Added, New Sanitary And Ancillary Rooms Will Be Created, And The Hallway, Ventilation And Stair Railings Will Be Renewed. The Facade Has A Ventilated Wooden Facade With Mineral Insulation. Upper Floor: In The New Building, Two Classrooms Are Being Built In Solid Wood With Wooden Box Ceilings And Integrated Acoustics. In The Existing Building, The Lighting Of A Classroom Will Be Moved To The West. To Do This, Existing Windows Are Closed And New Windows Are Installed. In Addition, New Door Openings With Soundproof Doors Are Being Created To Ensure A Second Escape Route. Here Too, The Facade Is Insulated And Covered With Wood. Attic: An Existing Gable Window Is Closed Due To A New Exhaust Chimney. Explanation Of The Intermediate Building Component: Demolition And New Construction: The Existing Intermediate Building Will Be Completely Demolished And Rebuilt. New Foundations, Reinforced Concrete Columns And Ceilings Are Being Built Between The Gym And Building “A”. The Former Inner Courtyard Will Be Converted Into An Atrium And Expand The Common Areas. Ground And Upper Floors: Due To The Dismantling Of Existing Walls, Previous Management And Cloakroom Areas Will Be Eliminated. Instead, New Restroom And Cloakroom Areas Will Be Created With Drywall, New Doors And Skylights. Explanation Of The Inner Courtyard Component Basement: An Underground Connecting Structure Made Of Reinforced Concrete
Contact Information
Address
Münchner Straße 5
Contact No.
0810289035
Email
alexander.eschenbach@brunnthal.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112913634
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.