|
A Detailed Description Of The Subject Of The Order, Conditions And Method Of Its Implementation Is Attached As Annex No. 1 Opz To Swz. As Part Of The Task, The Modernization Of The Rooms On The First Floor Of The Building Of Primary School No. 2 (7 Classrooms, 3 Bathrooms, A Corridor, 1 Storage Room Next To The Classroom, The Vice-Principals Room, The Teachers Room And The Teachers Room) Should Be Carried Out After Replacing The Power Supply, Control And Lighting Installations As Well As The Low-Current Installation. A Construction Works: As Part Of The Construction Works, The Above-Mentioned Tasks Include: In The Rooms, Floors Made Of Laminated Floor Panels, Pvc Tiles, Terracotta Should Be Dismantled, Concrete Bases Should Be Removed (Sands), After Cleaning, A Building Foil Should Be Laid And A Leveling Layer Made Of Cement Mortar (Screed) Should Be Made Along With The Necessary Expansion Joints And Priming. Make New Floors With Linoleum And Pvc Glued Cladding. Dismantle The Old And Install New Door Joinery And Ventilation Grilles, Remove Loose Plaster, Fill In Any Gaps, Install Aluminum Corner Profiles With Mesh On The Corners Of The Walls, Smooth The Ceilings And Walls With Gypsum Plaster, Prime And Paint At Least Twice With Easily Washable Acrylic Emulsion Paints, Apply Glaze In Places Where There Are Washbasins. New Aprons Made Of Pvc Cladding, Replace Sanitary Elements (Sinks, Washbasins, Faucets, Toilet Bowls With Cisterns, Approaches, Siphons, Inspections And Risers On The Constructed Floor, Etc.), Deliver And Install Mirrors Above The Washbasin, Paper Towel Dispensers And Toilet Paper Holders, Toilet Brushes, Replace Two Fire Hydrant And Recess Cabinets. Including Equipment, Wallpapering The Walls With Latex Photo Wallpaper, Making Paneling With Resin Mineral Plaster, Painting The Existing Central Heating Installation, Cleaning, Degreasing, Renovation And Painting Terrazzo Window Sills With Acrylic Enamel, Delivery And Installation Of Fenders, Delivery And Installation Of Information Boards With Room Numbers In Aluminum Frames, Delivery And Installation Of Renovation Overlays On Terrazzo Window Sills, Delivery And Installation Of Window Blinds In Cassettes, Delivery And Installation Of Thematic Flat And Three-Dimensional Decorative Elements, Made Of Plasterboard, Wooden And Wood-Like Boards, On Door Leaves And Walls Of Teaching Rooms, Delivery And Installation Of Magnetic Boards And Cork Boards. Installation Of Dismantled And Secured Equipment In Classrooms And Service Rooms.B. Electrical Works: As Part Of Interior Electrical Works, Existing Electrical Installations Should Be Dismantled, Including Lighting Fixtures, Switches, Plug Sockets And Bell Installations. Delivery And Installation Of New Basic, Additional (Board Zone) And Emergency Lighting Installations, Plug Sockets, Connectors In The Newly Prepared Surface (Grooves, Protective Pipes) Made Of Cable Conduits, Along With The Delivery And Installation Of Led Lighting Fixtures (Surf
|