|
Construction Work For Bridges And Tunnels, Shafts And Subways – 1250-20 Advanced Special Civil Engineering Work - Combined Structure. The Main Service Parts Are: Quantity Unit Description 1.00 Psch Setting Up, Maintaining, Maintaining And Clearing Construction Site Equipment 104.00 Wo Extension Provision Item 1.1.1 Construction Site Equipment 1,450.00 M² Improve Soil Storage Area Advance Special Foundation Engineering Work (Sheet Piling, Earthworks, Uwb) 122.00 M³ Liquid Soil For Filling Pipeline Trenches, Deliver And Install 1,740.00 M² Frost Protection Base Layer Gravel-Chip-Sand 1,610.00 M³ Soil Loosen The Excavation Pit, Load It, Transp. Truck, Store, Set Up Rental, Excavation Pit Depth Approx. 2.3 To 2.5 M 2,200.00 M³ Soil, Loosen Excavation Pit, Load, Transp. Truck, Store, Set Up Rental, Excavation Pit Depth Approx. 2.3 To 2.5 M 2,344.00 T Of Soil In Items 2.1.13, 2.1.117 And 2.1.122 From Rental, Pick Up, Load, Transp. Truck An, Dispose Of 3,224.00 T Of Soil From Items 2.1.14 And 2.1.89 From Rent, Load, Transp. Truck An, Dispose Of 2,300.00 M² Frost Protection Base Layer Of Gravel, Chippings And Sand 3,450.00 M³ Of Soil Loosen The Excavation Pit, Underwater Excavation, Load, Transp. Truck, Set For Rent, Excavation Pit Depth Approx. 4.00 To 5.0M 3,590.00 M³ Soil Loosening Excavation Pit, Underwater Excavation, Loading, Transp. Truck, Set On Rental, Excavation Pit Depth Approx. 5.5-6M 38.00 D Interruption / Standstill Soil Loosen Excavation Pit, Underwater Excavation Items 2.1.27 And 2.1.28 6,690.00 T Pick Up Soil From Rental, Load, Transp. Truck An, Dispose Of 6,852.00 T Of Soil From Rent, Pick Up, Load, Transp. Truck An, Dispose Of 754.00 M² Allowance Exposing Sheet Pile Wall Valleys In The Groundwater 1,100.00 M³ Soil Filling, Height 0.5 M, Sts Bk10 Dpr1 0/32, Layers Of D 20 Cm, Excavation Pit Combination Building 1,184.00 T Topsoil Of Item 2.1.1 From Rentals, Load, Transp. Truck An, Dispose Of 2,082.00 M² Improve Existing Construction Roads, After Completion Of The Earthworks, Pick Up, Load, Transport 1,525.00 T Of Topsoil From Items 2.1.2 And 2.1.88. Truck An, Dispose Of 1,059.00 T Of Soil In Items 2.1.6, 1.1.10 And 1.1.11 From Rent, Pick Up, Load, Transp. Truck An, Dispose Of 359.00 T Of Concrete Demolition Material From The Interim Storage Area, Load, Transp. Truck An, Dispose Of 487.00 T Of Concrete Demolition Material From The Interim Storage Area, Load, Transp. Truck An, Dispose Of 383.00 T Of Concrete Demolition Material, Pick Up, Load, Transp. Truck An, Dispose Of Special Foundation Engineering Work 1.00 Psch Set Up, Maintain, Clear Construction Site Equipment, Sheet Pile Wall Shoring 104.00 Wo Extension Provision Item 4.1.1 Construction Site Equipment 29.50 T Leave Shoring In The Ground, Area Shaft No. 1 And 5 12.00 T Dispose Of Shoring From Shortening Items 4.1.25 And 4.1.26 202.00 M Install Grouted Anchors, L 14.5-15.0M 206.00 M Install Grouted Anchors, L 13.5-14.5M 2,610.00 M² Steel Sheet Piles Gu 14N, Insert With Low Vibration, Hold In Place, Pull 104.00 Weeks Extension Week Sheet Piling Planks / Shoring Wall Item 4.1.4 515.00 M² Steel Sheet Pile Gu 14N, Insert, Hold, Pull With Low Vibration, For Installation In The Area Of Shaft No. 5 Sheet Pile Wall Work Shaft No. 15 44.85 T Shoring Left In The Ground, Area Connection To Pipe Route 104.00 Where Ext
|