|
Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Conventional Lease Of Work, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024, Mobilization And Demobilization Of Percussion Survey Equipment With Standard Penetration Test (Spt) (Fixed Cost), Percussion Survey With Standard Penetration Test (Spt), Diameter 2.1/2, Exclusive Mobilization And Demobilization, Mechanized Excavation For Crowning Block Or Footing With Backhoe (Including Excavation For Placing Formwork). Af_01/2024, , Edital.Pdf, Preparation Of The Bottom Of A Trench With A Width Of Less Than 1.5 M (Adjustment Of The Natural Soil). Af_08/2020, Slim Concrete Ballast, Applied To Crowning Blocks Or Footings, 5 Cm Thick. Af_01/2024, Manufacture, Assembly And Disassembly Of Shoe Formwork, Made From Resin Plywood Sheet, E=17 Mm, 4 Uses. Af_01/2024, Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 6.3 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Concreting Footing, Fck 20 Mpa, Using Jerica - Laying, Densifying And Finishing, Manual Backfilling Of Trenches, With Percussion Soil Compactor. Af_08/2023, Manual Excavation For Baldrame Beam Or Running Footing (Including Excavation For Placing Formwork). Af_01/2024, Thickness 5 Cm., Assembly And Disassembly Of Formwork For Baldrame Beam, In Sawn Wood, E=25 Mm, Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, 3 Mm Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel Assembly. Af_01/2024, Concreting Of Crowning Block Or Baldrame Beam, Densification And Finishing., With Percussion Soil Compactor., Chapisco Applied To Masonry And Internal Concrete Structures, With A Trowel. Mortar Trace 1:3 With Manual Preparation. Af_10/2022, Surface Waterproofing With Cement Mortar And Sand, With Waterproofing Additive, E = 1.5Cm. Af_09/2023, Surface Waterproofing With Asphalt Emulsion, 2 Coats. Af_09/2023, Assembly And Disassembly Of Formwork For Rectangular Pillars And Similar Structures, Simple Right Foot, 8 Uses. Af_09/2020, Assembly And Disassembly Of Beam Formwork, Without Propping, Made Of Resin Wood Sheet, 8 Uses., Propping With Wooden Fork, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 5.0 Mm Ca-60 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 6.3 Mm Ca-50 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 8 Steel, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 10 Steel, Unidirectional Precast Slab, Bi-Supported, For Flooring, Ceramic Filling, Conventional Joist, Total Slab Height (Filling+Cover) = (8+4). Af_11/2020, Concreting Of Pillars, Fck = 20 Mpa, Using Buckets - Laying, Densifying And Finishing. Af_02/2022, Concreting Of Beams And Slabs, Fck=20 Mpa, For Any Type Of Slab With Buckets In A Single-Story Building - Launch, Sealing Masonry Of Horizontally Drilled Ceramic Blocks Of 9X19x19 Cm (Thickness 9 Cm) And Laying Mortar Prepared In Bet
|