Removal Of Fencing, Installation Of Fencing For Courts, Execution Of Masonry Wall;, Execution Of Baldrame Beam With “U” Channel Type Concrete Blocks, 05/08/2026 - 14:30:14, Execution Of Retaining Wall In Concrete Block E=15Cm, Execution Of Retaining Wall In Reinforced Concrete., Execution Of Rectangular Pillar In Reinforced Concrete., Execution Of Rectangular Beam In Reinforced Concrete, Execution Of Reinforced Concrete Slab, Hardware Frame For Reinforced Concrete Structure, Gauge Up To 12.5Mm., Execution Of Masonry In Concrete Block E=10Cm, Execution Of Masonry In Concrete Block E=15Cm, Execution Of Masonry In Perforated Ceramic Brick E=10Cm, Execution Of Masonry In Perforated Ceramic Brick E=15Cm, Execution Of Masonry In Solid Brick, Installation Of Partition Wall In Mdf, Installation Of Drywall Partition Wall, Execution Of Roofing Or Retiling, Execution Of Wooden Framing For Roof In Colonial Type Tile., Execution Of Wooden Framing For Roof In Fibercement Tile., Installation Of Gutter In Galvanized Sheet Up To 60Cm, Installation Of Asphalt Blanket Up To 30Cm Wide, Execution Of Pvc Lining, Execution Of Plaster Lining., Installation Of Socket Point Embedded In The Wall, Installation Of Complete Lighting Point, Installation Of Corrugated Conduit In Wall, Diameter Up To 1\, Installation Of Pvc Conduit In Slab, Floor Or Wall, Installation Of Circuit Breaker Panel Up To 12 Circuit Breakers., Installation Of Electric Shower, Installation Of Standard Entrance, Installation Of Toilet With Attached Box, Installation Of Simple Toilet, Installation Of Wash Basin Complete, Execution Of Cold Water Piping, Diameter Up To 32Mm, Diameter Greater Than 32Mm, Execution Of Sewage Piping, Diameter Up To 100Mm, Diameter Greater Than 100Mm, Installation Of Complete Water Tank, Installation Of Measuring Trestle., Execution Of Straightened Subfloor In Simple Concrete E=5Cm, Execution Of Polished Floor, Execution Of Accessibility Ramp In Simple Concrete., Execution Of Straightened Subfloor In Mortar E=2.5Cm, Laying Of Ceramic Floor On Straightened Subfloor, Laying Of Ceramic Coating On Wall, Laying Of Ceramic Skirting With Prefabricated Mortar, Removal Of Ceramic Floor., Execution Of Plastering With Cement And Sand, Mix 1:3, Execution Of Plaster With Fine Sand Mortar, 1:4, Execution Of Plastering With Fine Sand Mortar, 1:5, Execution Of Plaster Plaster, Removal Of Plaster, Installation Of A Complete Door In A Wooden Frame Up To 90X210cm Span., Iron Tilt Window Installation., Removal And Reinstallation Of Wooden Door, Window Removal, Installation Of Complete Metallic Gate With Span Up To 100X210cm., Installation Of Complete Metallic Gate With Span Greater Than 100X210cm Up To 350X22, Waterproofing With Asphalt Blanket, Waterproofing With Painting With Asphalt Emotion, Filling Hole With Hexagonal Block, Filling Hole With Asphalt Mass, Execution Of Curb Molded In Place, Execution Of Gutter Molded In Place Up To 06 Cm Thick, Execution And Compaction Of Manual Landfill, Execution Of Smooth Wire Fence, Execution Of Barbed Wire Fence, Installation Of Wooden Bridge Deck, Installation Of Wooden Bridge Pillar, Installation Of Wooden Bridge Beam, Execution Of Footing For Bridge Pillar Of Up To 1M³ Of Concrete With Hand Stone, Execution Of Pva Latex Painting, Execution Of Synthetic Enamel Painting On Wall, 02 D
|