4.1. The Subject Of The Order Is The Implementation Of The Investment Project Entitled: Reconstruction Of Dp 4306E On The Section From Provincial Road No. 726 To The Town Of Bartoszówka. 4.2. Scope Of Works And Activities For The Entire Construction Project: 1. Existing State Of Land Developmentthe Road Being The Subject Of The Task Connects The Towns Of Sadykierz And Bartoszówka. The Section Begins At The Intersection With Provincial Road No. 726 In The Town Of Sadykierz, Then Runs Through The Built-Up Area Of This Town And Ends At The Place Where The New Road Surface Was Installed In Previous Years. The 1,442.00 M Long Section Planned For Reconstruction Generally Runs Through Built-Up Areas With Farm Buildings On Both Sides And An Undeveloped Area Surrounded By Arable Fields. The Road In Its Existing Condition: Road With A Bituminous Surface, Approx. 4.5 - 5.5 M Wide, Aggregate Roadsides 1.0-1.5 M Wide, Drainage Ditches Covered With Silt, Partially Disappearing, One-Sided Sidewalk Made Of Concrete Paving Slabs, Exits Made Of Concrete Paving Stones And Dirt Roads. There Are Culverts Under The Road Crown Intended For Reconstruction. The Areas Where The Road Reconstruction Is Planned Have Infrastructure: Water Supply, Sanitary Sewage, Power Line, Telecommunications Network, Terrestrial Energy Network - Developed Area. Currently, The Communication System Is In A Varied Technical Condition. Discharge Of Surface Rainwater To Adjacent Areas.2. Scope Of Works Covered By The Order: The Reconstruction Of District Road No. 4306E Is Planned. On The Section Covered By The Task, I.E. 1,442 M, The Following Works Will Be Performed: - Preparatory And Demolition Works, - Basic Earthworks, - Setting Of Curbs And Concrete Edges, - Pavement Surfaces Made Of Concrete Paving Stones, - Foundations Made Of Soil Stabilized With Cement Rm = 2.5Mpa, - Foundations Made Of Crushed Aggregate, - Construction Of A New Binding And Wearing Course Of Mma, - Reconstruction Of Exits Along With With Culverts, - Reconstruction Of Culverts Under The Road Crown, - Reconstruction Of Roadsides, - Cleaning, Deepening Of Roadside Ditches, - Installation Of Horizontal And Vertical Markings, - Securing Or Rearranging Geodetic Control Network Points, - Performing An As-Built Inventory, - Developing A Temporary Traffic Organization Project, - Marking The Task With An Information Board About Co-Financing.4.3. A Detailed Description Of The Subject Of The Order Can Be Found In Annex No. 1 To The Swz. It Consists Of The Following Documents: 1) Design Documentation Along With The Decisions And Arrangements Obtained, 2) Technical Specification For The Execution And Acceptance Of Construction Works (Stwiorb). If The Content Of The Design Documentation And Stwiorb Contains Any Provisions Regarding The Conditions For The Implementation Of The Subject Of The Order, E.G. Rules For The Introduction Of Additional Or Replacement Works, Acceptance Of Works, Method Of Settlement, Which Are Not Reflected In
|