|
1. The Subject Of The Order Is The Modernization Of The Playground At Ul. Major Yuri Gagarin (Kadzielnia Area) In Kielce, Located On Plot No. 2/6, District 0023. 2. The Subject Of The Order Was Divided Into Stages (Stage I And Ii) And Includes In Particular: 2.1. In The Scope Of Stage I: 1) Development - Based On The Functional And Utility Program (Ffu), Constituting Annex No. 5 To The Swz And Applicable Regulations - Complete Design Documentation And Submitting It To The Ordering Party; 2) Obtaining, At Your Own Expense, Maps, Arrangements, Opinions, Tests And Checks Of The Design Documentation Necessary And Required By Law, Necessary To Develop Complete Design Documentation Drawn Up On A Map For Design Purposes, Enabling The Notification Of The Intention To Perform Construction Works. 2.2. Within The Scope Of Stage Ii: 1) Dismantling And Disposal Of Existing Equipment [Except For The Sandbox, Which Is Intended For Further Use And Remaining In Its Current Location, With The Possibility Of Its Possible Disassembly And Relocation Only In The Cases Specified In The Functional And Utility Program (Ffu), Constituting Annex No. 5 To The Swz]; 2) Purchase, Delivery And Assembly Of Playground Equipment And Elements: A) A Large Play Set With A Slide (1 Piece), B) A Carousel Integration For Children And Wheelchair Users (1 Pc), C) Double Swing Swing With A Seat For Children Aged 1-3, Basket Type (1 Pc) And With A Storks Nest Seat (1 Pc), D) Double Swing Swing With A Seat For Children Aged 3-14 (1 Pc), E) Weight Swing (1 Pc), F) A 1-Person Springboard Rocker (1 Pc), G) A 4-Person Springer Rocker (1 Pc), H) Benches With Backrest And Armrests (4 Pcs, Including At Least 1 Pc Available For People With Disabilities), I) A Four-Part Bin For Sorted Waste (1 Pc), J) The Memo 50 Educational Game (1 Pc), K) An Information Board In The Form Of An A3 Poster With The Budget Logo Citizens Budget And Information On Financing From The Citizens Budget With Playground Regulations (1 Piece); 3) Installation Of All Equipment While Maintaining Safe Zones Adapted To Individual Playground Equipment; 4) Construction Of A Polyurethane Shock-Absorbing Surface Poured On A Previously Prepared Surface In Min. 2 Colors Under Double Swing Swings, An Integration Carousel, A Large Play Set With A Slide And, If Necessary, Under Other Play Equipment; 5) Construction Of A Pedestrian Walkway From Bevelless Concrete Cubes With A Thickness Of Min. 6 Cm, Adapted To Pedestrian Traffic And Accessibility For People With Disabilities; 6) Renovation And Repainting Of The Existing Metal Fence, Approximately 100 M Long, Along With Replacing The Gate Lock; 7) Restoring The Surface After Construction Works, By Leveling, Topsoiling And Grassing; 8) Obtaining A Certificate Of Inspection Of The Completed Playground, Confirming Compliance With The Pn-En 1176 And Pn-En 1177 Standards Or Equivalent, Carried Out By A Playground Safety Specialist Or Other Accredited Entity; 9) Development And Submission To The O
|