|
Repair And Maintenance Services Of Machinery - Renovation Of The Rolls-Royce Gas Engine Installed In The Cogeneration Facility At Ul. Weteranów 13, 84-200 Wejherowo. 1. Renovation Of The Rolls-Royce Gas Engine Installed In The Cogeneration Facility At Ul. Weteranów 13, 84-200 Wejherowo 2. The Scope Of The Subject Of The Order In Accordance With The Manufacturers Overhaul Schedule Rms (Routine Maintenance Schedule) After 60,000 Hours Of Operation, Includes In Particular: A) Measurement Of Crankshaft Springback And Axial Clearance, B) Measurement Of Crankpins, C) Verification Of Connecting Rods Along With Measurements - 16 Pcs., D) Renovation Of Cylindrical Sleeves Including Honing - 16 Pcs., E) Overhaul Of Cylinder Heads (Including The Service Of Bushing The Exhaust Ports) - 16 Pcs., F) Overhaul Of The Ht/Lt Water Pump - 1 Pc., G) Overhaul Of Gas Supply Valves - 16 Pcs., H) Overhaul Of Gas Control Valves (Throttles) - 16 Pcs., I) Overhaul Of Pre-Chambers - 16 Pcs., J) Overhaul Of Valves Indicator K) Inspection Of The Flexible Coupling Between The Engine And The Generator (Including Measuring The Hardness Of At Least 5 Rubbers), L) Inspection Of The Transmission Drive Of Suspended Pumps, M) Renovation Of The Vibration Damper, N) Inspection Of Camshaft Bearings - Side A And B, O) Inspection Of Camshaft Cams - Side A And B, P) Inspection Of Frame Bearings - 2 Pcs., Q) Replacement Of Bearings Crankshafts With Screws And Nuts, R) Replacement Of Washers Between The Crank Bearing Housing And Connecting Rod Rod - 16 Sets, S) Replacement Of Fuel Rail Bearings, T) Replacement Of Pistons - 16 Pcs. (Subject To The Provisions Of Points 3.6. And 3.7. Swz), U) Replacement Of Piston Pin Shells - 16 Pcs., V) Replacement Of Piston Rings - 16 Sets, W) Replacing High Voltage Cables And Spark Plugs - 16 Pcs., X) Cleaning The Engine Block And Crankcase With The Oil Pan, Y) Cleaning The Charge Air Cooler, Z) Flushing The Oil System, Aa) Replacing Main Oil Filters - 2 Sets, Bb) Cleaning The Centrifugal Oil Filter, Cc) Inspection And Cleaning Of The Oil Mist Detector, Dd) Inspection Of The Technical Condition Of The Exhaust Gas Channel Compensators, Ee) Checking The Tightness Of The Exhaust Duct (With The Possibility Of Replacing The Seals If Necessary), Ff) Verification Of Pressure Transducers, Temperature Sensors And Engine Protection, Gg) Preparation Of A Service Report 3. The Scope Of The Subject Of The Order Is Not Included In The Manufacturers Rms (Routine Maintenance Schedule) Repair Schedule, Consisting In The Renovation Of Two Turbochargers Mounted On The Engine, Includes: A) Disassembly And Assembly Of Turbochargers, B) Renovation Of Turbochargers, Including: Purchase, Delivery And Installation Of Spare Parts In Accordance With The Provisions Of The Device Manual; C) Inspection Of Other Turbocharger Components And Their Possible Replacement, If Necessary (According To The Principles Described In Point 3.23 Of The Swz); D) Performing Clearance Measurements And Balancing Rotors, E) Performing Test Tests While The Engine Is Running, F) Performing Adjustments Of Devices After Starting The Engine, G) Preparing Service Reports (**) Separate For Each Turbocharger. 4. As Part Of The Subject Of The Order, The Contractor Is Obliged To Deliver:
|