Tenders are invited for Installation of a Partition to Divide Al-Jalil Hall into Two Halls Continuing Education 1- Cutting and opening works on an existing gypsum ceiling to enable the Contractor to insert the proposed gypsum partitionas specified in the subsequent Item 2along with its insulation, ensuring it extends up to the concrete slab; followed by closing the openings and performing all necessary repairs in accordance with standard practices. A-01 A-02 A-03 1 LS 2- Supply and installation of straight gypsum partition walls, finished on both sides with 12mm "Piano" sound-insulating gypsum board and supported by 0.6mm thick galvanized steel framing (studs spaced every 40cm). This includes the supply and installation of 60-density insulation (60-psi compression strength), clad on both sides with a nylon vapor barrier, in dimensions of 40 x 120 x 5 cm, applied across the entire wall surface in accordance with standard practices. A-01 A-02 A-03 18 m² 3- Supply and installation of a feature wall unit (on the primary face), comprising a composition of wood and porcelain elements, as well as a shelving cabinet fitted with clear glass doors. The carpentry components shall be constructed from moisture-resistant (green) MDF, clad with 1mm thick "Nano" Formica laminate (from Formex or an approved equivalent) featuring scratch-resistant properties; the edges shall be finished with the same material. The porcelain component shall be "Laminum" (or an approved equivalent) with a thickness of 6mm. The scope of work includes all necessary fittings, accessories, and a 5cm porcelain panel trim, executed in accordance with standard practices. A-01 A-02 A-03 1 LS 4- Supply and installation works for a wall feature on the reverse side (opposite face), comprising wooden and porcelain wall panels as well as a shelving cabinet with glass doors. The joinery components shall be constructed from green MDF clad in 1mm-thick Nano Formicaspecifically from Formex or an approved equivalentfeaturing scratch-resistant properties. The lettering shall be fabricated from the same material. The porcelain component shall be "Laminum" (or an approved equivalent) with a thickness of 6mm. The scope of work includes the provision of all necessary parts and accessories for the installation, as well as 5cm porcelain skirting panels, executed in accordance with standard professional practices. A-01 A-02 A-03 1 LS 5- Puttying and painting works for all wallsutilizing "Dulux Weather Shield" or an approved equivalentand for all ceilingsutilizing "Dulux Vinyl Matt" or an approved equivalent. This includes the application of putty, sanding, joint taping, corner reinforcement, and painting on all gypsum walls and ceilings. Additionally, the scope covers puttying, sanding, and painting on all brick and concrete walls, executed in accordance with standard professional practices. These works shall be carried out across the entire area of both halls, following the physical separation of the large hall. -- 1 LS supply and installation of a partition to divide Al-Jalil Hall into two separate halls. The works will be carried out at the Continuing Education Center Board of Trustees Building, located within Birzeit University in Ramallah. The project must be executed in accordance with the terms, conditions, and technical specifications outlined in the tender documents and attached files [Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.] Tender Link : https://www.jobs.ps/en/tenders
Contact Information
Address
PO Box 14, Birzeit West Bank, Tel: +970-2-298-2000, Fax: +970-2-281-0656
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112581244
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.