2. The Subject Of The Order Are Construction Works Consisting Of: 1) Replacement Of Window Joinery - According To The List And Photographic Documentation - White Windows With A Max Coefficient U = 0.9 W/(M2*K) - Total Window Area 42.91 M2 - Annex No. 11 - List Of Window Joinery. Attention! Before Installation, Check The Dimensions At The Construction Site. 2) Replacement Of External Door Joinery - According To The List And Photographic Documentation - Doors With A Max Coefficient U = 1.30 W/(M2*K) - Total Door Area 14.07 M2 - Annex No. 12 - List Of Door Joinery. Before Installation, Check The Dimensions At The Construction Site. 3) Insulate The External Walls Of The Building With Styrofoam Thickness. 15 Cm With Lambda Coefficient = 0.032W/(M*K) With Pins (4 Pcs/M2), Mesh And Light Gray Facade Plaster - Total Area Of Walls To Be Insulated 356.80 M2. Elevation From The Street. I Maja Should Be Performed In Accordance With The Attached Visualization - File Entitled Design Of The Façade From The Side Of Ul. I Maja. Make The Remaining Walls Without Decorative Elements. Additionally, Make A Plinth 0.5 M Above The Ground With Mosaikputz Plaster - Color To Be Agreed During The Facade. Attention! Currently, There Are Cables And Other Telecommunications Infrastructure On The Facade (See Photographic Documentation). During The Works, The User Must Agree On The Liquidation Or Retention Of The Above-Mentioned Infrastructure. 4) Insulating The Jambs With Thick Polystyrene. 3 Cm With Lambda Coefficient = 0.032W/(M*K), Eps 70 With Mesh And Light Gray Facade Plaster - Total Area Of Reveals To Be Insulated Approx. 25.0 M2; 5) Installation Of External Window Sills Made Of Galvanized Sheet Metal. 0.50 Mm In Gray / Silver - Width Of Window Sills 25 Cm - Length Of Window Sills = Window Width + 10 Cm - Total Length Of Window Sills - 34.80 M - Number Of Window Sills 24 Pcs. 6) Insulating The External Wall From The Inside With Pir Boards. 12 Cm (Wall Facing The Wieprza River) - Lambda = 0.026 W/(M*K) Including Mesh And Painting - Total Wall Area To Be Insulated 37.05 M2; 7) Insulating The Flat Roof Above The Building (Story Part) By Insulating With Styrofoam Thickness. 25 Cm - Lambda = 0.036W/(M*K), Eps 100 And Construction Of A New Roof Covering With Double Thermally Weldable Underlay Felt And Top Covering With A Total Area Of Approx. 108.0 M2 - Underlay Felt Based On Sbs Modified Asphalt, On A Polyester Matrix, Thickness. Min. 5.2 Mm, Top Covering Felt Based On Sbs Modified Asphalt, With A Polyester Matrix, Thickness. Min. 5.2 Mm, Coarse-Grained Topping.8) Replacement Of Sheet Metal Flashings (Approx. 30 M2), Downpipes (Approx. 36 M) And Gutters (Approx. 85 M) - Sheet Metal Flashings, Pipes And Gutters Made Of Galvanized Sheet Metal. 0.50 Mm Gray / Silver Color; 9) Insulating The Ceiling Spaces (On The Ground Floor Of The Building) By Injecting Cellulose Wool With A Thickness Of 30 Cm - Lambda 0.032 W/M*K With A Total Area Of 175 M2; 10) Replacement Of The Cent
Contact Information
Address
Gmina Miasto Darłowo,Darłowo,76-150,Zachodniopomorskie,Pl426 - Koszaliński
Contact No.
943551248
Email
zamowienia.publiczne@darlowo.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112537800
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.