1. The Subject Of The Order Is The Modernization Of Anti-Slope Floors In The Third Stand In The Traffic Route, Along The Promenade And The Fourth Stand On The Staircase Landings Of The Municipal Stadium In Poznań At Ul. Bułgarska 17, Called Enea.2. Scope Of The Order: • Stand 3, Level +6.60, Promenade In Axes: G-P From The Expansion Joint In The G Axis To The Expansion Joint In The P Axis, With An Area Of 1219 M2, • Stand 4, Level +14.19, Open Staircase Landings: From Axis 11 (Corner 1 And 4 Of The Stand), 7,6,5,2,1,-1,-2,-5,-6,-7,-11 (Corner Of Stands 4 And 3) With An Area Of 289 M2.3. The Material Needed To Perform The Works Is: • Two-Component Epoxy Or Epoxy-Polyurethane Resin, 2.5 - 3.0 Mm Thick, With A Non-Slippery Surface And Increased Flexibility For Surfaces With Extreme Pedestrian Traffic Loads. The Insulating Surface Must Have The Ability To Transfer Cracks In The Static And Dynamic Range (Class B 3.2 At -20C), Limit The Transmission Of Sounds To The Concrete Slab, Including Those Coming From Impacts On The Ground, Constitute A Coating, A Water-Impermeable Barrier With A Top Layer Resistant To Uv Radiation, Made With A High Degree Of Anti-Slip (R11/R12) To Ensure The Safety Of Users. • Elastomeric Expansion Joint Tape For Sealing Waterproof Expansion Joints• Permanently Plastic Masses With A Rope To Fill Construction Expansion Joints4. Due To The Specialized Nature Of The Works Related To The Installation Of The Repair System In Which Resin Floors Will Be Made, The Contractor Is Obliged To Have Training In Its Use Documented By The Manufacturer Of The Repair System.5. Pursuant To Art. 60 And 121 Of The Act, The Ordering Party Requires The Contractor Or Contractors Jointly Applying For The Contract To Complete The Order For The Installation Of A Resin Floor Repair System Without The Participation Of Subcontractors.6. A Detailed Description Of The Construction Work Is Included In The Annexes To The Terms Of Reference: Annex No. 7 - Description Of The Subject Of The Contract, Annex No. 9 - Technical Specification For The Execution And Acceptance Of Works, Annex No. 10 - Bill Of Quantities, Annex No. 8 - Plans, 7. The Ordering Party Obliges The Contractor To Carry Out An On-Site Inspection; The Offer Of A Contractor Who Does Not Carry Out An On-Site Inspection Will Be Rejected In The Proceedings. The Ordering Party Sets The Date Of The On-Site Inspection For May 7, 2026 At 9:30. Place: Posir Office, Municipal Stadium, Ul. Bułgarska 17 In Poznań.8. The Contractor Will Be Obliged To Have A Paid Insurance Policy Throughout The Duration Of The Contract, And In The Absence Thereof, Another Document Confirming Civil Liability Insurance (Oc) In The Scope Of The Business Activity Related To The Subject Of The Order With A Guarantee Sum Not Lower Than: Pln 1,000,000.00 (One Million Zlotys 00/100). Liability Insurance Should Cover Civil, Tort And Contractual Liability For Personal And Property Damage And Their Consequences. Before Signing The Contrac
|