Road Construction Works – Csongrádi Sgt. Traffic Development, Bicycle Path Construction. Creation Of A Bicycle Path In Csongrádi Sgt. - Rózsa U. - Makkosházi Krt. In The Section Between Description Of The Construction Work: - A New Two-Way Bicycle Path Will Be Built, 675 M On The East Side And 690 M On The West Side. A 103 M Long Separated Pedestrian And Bicycle Path Is Being Built On The E Side, And A 673 M Long New Sidewalk Is Being Built On The W Side, Which Means A Total Of 4915.7 M2 Of Bicycle Path, Pedestrian And Bicycle Path And Sidewalk Construction. - Renovation Of 2 Pedestrian And Bicycle Crossings At Sárosi Utca – Ág Utca, Including The Traffic Lights. - The Csongrád Sgt. - Makkosházi Krt. Node Is Partially Transformed. - Next To The New Sidewalk Being Built On The West Side, A New Public Lighting Network Will Be Established. - The Communication Networks Affected By The New Facilities Will Be Partially Replaced And Partially Protected. - Plants And Trees That Are Not Planted According To Plan, Invasive Or In Poor Condition (Dried Out) Will Be Cut Down. A Total Of 79 New Trees Will Be Planted On Both Sides In The Project Area, And 145 Trees In The Administrative Area Of Szeged, In Other Locations (External Location: 107 Trees In The Gyevi Park Area, 38 Trees In The Area Of Tápé 17841 Hrsz), And Shrubs Will Be Planted On 2,255 M2 And Turfing On 3,340 M2. A Plan And Address List Will Be Issued For External Locations. - Construction Of Water Intake Points (Water Outlet) On The E And W Sides, 5 Each. Before The Construction Of The Water Intake Points, The Tree Felling And Shrubbery Demolition Works Must Be Carried Out On The Affected Trails. The Main Types Of Work And Planned Quantitative Data Of The Investment: Road Construction (Bicycle Path, Sidewalk): - Mirror Production: 3,999.5 M2 - Soil Improvement Rtg. Preparation (Sandy Gravel): 799.9 M3 - Preparation Of Mechanically Stabilized Base Layer (Fzka): 537.93 M3 - Preparation Of Soil Stabilization (Ckt): 71.89 M3 - Preparation Of Edge: 4,436.1 M - Asphalt Base Layer: 17.57 M3 - Asphalt Binding Layer: 145.49 M3 - Asphalt Wear Layer: 313.44 M3 - Tree Felling: 224 Pcs - Tree Planting: 224 Pcs - Shrub Planting: 2,255 M2 - Weeding: 3,340 M2 Electrical Works: - Laying Street Lighting Cable: 2,485 M - Placement Of Street Lighting Pole With Luminaire: 59 Pcs - Placement Of Street Lighting Fixture: 119 Pcs - Low Voltage Wires Reconstruction, Replacement: 1,320 M - Expansion And Conversion Of Traffic Control Equipment: 2 Junctions The Permits Issued For The Facility And A Detailed Description Of The Task Are Included In The Construction Documentation. The Physical Construction Investment Is The Lxix Of 2023 On The Order Of State Construction Investments. Is Subject To The Law. 321/2015. (X.30.) On The Basis Of The Provisions Of § 46, Paragraph (3) Of Cr. When Referring To A Specific Procedure That Characterizes The Products Of A Given Economic Operator Or The Services Provided By It, Or To A Trademark, Patent, Activity, Person, Type Or A Given Origin Or Production Process, The Term Or Equivalent Must Also Be Understood In Addition To The Reference.
Contact Information
Contact No.
+36 62564363
Email
kozbeszcsop@szeged.eu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112527010
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.