|
Hiring (01) A Sound Designer For The Three Days Of May 13, 14 And 15, 2026, With Appropriate Equipment To Connect To The Sound System, With The Performance Starting At 7:30 Am With A Wide Musical Repertoire, And Must Remain At The Event Location Until The End Of The Schedule, That Is, Until 8:30 Pm The Next Day. Note - The Songs May Not Contain Violence, Apology For Crime, Order Or Contain Inappropriate Lyrics Violating The Classification Of Free Censorship., Supply Of Food For The Organizing Team (Audience Guides, Municipal Guard Brigades, Health Surveillance, Fire Department, Military Police, Emergency Services And Coordination), Total Of 80 People. Containing A 350 Ml Can Of Soft Drink (Refrigerated) First Line And A Snack; Ingredients Bread, Hamburger, 50G Of Chopped Bacon, 1 Egg, Two Slices Of Ham, Two Slices Of Mozzarella (Cheddar), 1 Lettuce Leaf, 1 Tomato Slice (All Snacks Must Be Individually Packed) Delivery Must Occur On The 3 (Three) Days Of The Event May 13, 14, 15, 2026., Hiring A Professional Electrician To Create The Electrical Installation Network At All Points, Containing Sockets, Sockets And Circuit Breakers, Electrical Installations At The Entrance Portal, Facade And Decoration, In Addition To All Electrical Installations At The Sports Module Event Venue (According To The Event Project), These Must Be Installed By May 13Th Of The Current Year. Note: The Electrician Must Connect All Event Lighting Directly To The Generator Provided By The Organization For The Occasion. The Service Includes: Prior Checking Of The Total Power Of The Lighting Loads To Be Connected. Checking The Generators Capacity To Support The Installed Load.Installation And Organization Of Power Cables, Ensuring Safety, Adequate Isolation And Identification Of Circuits.Execution Of Connections In Accordance With Current Technical Standards (Nbr 5410), Using Appropriate Connectors.Operation Tests Of All Lighting Points After Energization.Technical Support During Operation Event.All Installation Materials (Cables, Connectors, Circuit Breakers, Etc.) Must Be Previously Available On Site. The Electrician Must Use Appropriate Epi And Ensure That All Connections Are Protected Against The Weather, When Applicable. Please Be Advised That The Electrician Must Remain On Call For Any Possible Electrical Surprises, Remaining In The Venue Throughout The Event On The 13Th, 14Th And 15/05/2026., Hiring 03 People For Labor Service (Braçal) For Cleaning The Patio Of The Sports Module For Every Day Of The Event On May 13Th, 15Th And 16Th, 2026., Advice And Event Organization Organize And Monitor All Event Activities For Their Perfect Functioning And Installation Of Banners And Signs As Guided By The Organization. Control Of The Audience Guiding Team Coordination Of The Dj And Announcer Coordination Of The Electrician Coordination Of Food Coordination Of Cleaning Coordination Of Arts Relevant To The Event Coordination Of Assembly And Distribution Of Tents And Stage Miscellaneous Coordination. Selective Waste Collection, Rental Of 02 Emergency Lights To Be Used In The Sports Module Space In The Fire And Panic Prevention Project On The 13Th, 14Th And 15Th Of May 2026, During The Event., Rental Of 2 12Kg (Abc) Fire Extinguishers And 14 6Kg (Abc) Fire Extinguishers With Plate Signage To Be Used
|