|
Structural Steelworks – Sep Gs Schützenstraße - Renovation And Expansion - Locksmith And Steel Construction Work. Locksmith And Steel Construction Work In The Interior And Exterior Of New Buildings And Existing Buildings (Staircase Railings, Handrails, Escape Stairs) 1 Existing Building 1.1 Preparatory Work Work/Assembly Planning For All Constructions To Be Carried Out In/On Existing Buildings 1.2 Interior Area, Handrails New Handrails, Barrier-Free, Made Of Stainless Steel On Walls, Approx. 48 M; New Handrails, Barrier-Free, Made Of Galvanized Steel (Pre-Primed) On Walls, Approx. 19 M; 1.3 Outdoor Area, Steel Escape Staircase, Construction Of Stair Tower With Escape Staircase, Galvanized Steel, Approx. 11T Steel Girder; Filler Bar Stair Railing, Galvanized Steel, Approx. 90 M; Handrail, Barrier-Free, Galvanized Steel, Approx. 96 M; Platform Coverings, Grating, Galvanized Steel, R11, Approx. 34 M²; Steps, Grating, Galvanized Steel, R11, 69 Pcs; Underflow Protection Stair Access, Galvanized Steel, Filler Bar Grille With Door, Approx. 40 M² 1.4 Outdoor Area, Steel/Glass Canopy Cantilever Construction, T-Steel Beam, Galvanized Steel, L = 1.2-1.8M, 23 Pieces; Glass Clamp Profiles, Aluminum, L=1.2-1.8M, 23 Pieces; Glass Panes, Vsg Made Of Tvg, 8 Mm, 1-1.5 M², 22 Pieces; 2 Extension/New Building 2.1 Preparatory Work Work/Assembly Planning For All Constructions To Be Carried Out In The New Building 2.2 Interior, Steel Stair Railing Filler Bar Stair Railing, Galvanized Steel (Pre-Primed) Approx. 23 M; New Handrails, Barrier-Free, Made Of Stainless Steel On Stair Railings, Approx. 23 M; New Handrails, Barrier-Free, Made Of Stainless Steel On Walls, Approx. 106 M; 3 Hourly Wage Work, Hourly Rate Fa, Hourly Rate For Skilled Workers/Workers
|