|
Mobilization And Demobilization Of Work Distant From Urban Center With Over 3,000,000, 01, Full Site Civil Engineer With Additional Charges, Senior Site Civil Engineer With Additional Charges, Day Watchman With Additional Charges, General Foreman With Additional Charges, 10/04/2026 - 15:52:39, Assistant Office With Additional Charges, Appointor Or Appropriator With Additional Charges, Surveyor With Additional Charges, Surveyors Assistant With Additional Charges, Construction Master With Additional Charges, Supply And Installation Of Site Sign With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Temporary Water Connection For Construction Site, Including Hydrometer And Easel For Water Measurement - Main Entrance, In Galvanized Steel Dn 20Mm (1/2) - Concessionaire Standard, Sewer Connection For Construction Shed On Construction Site, Exclusive Septic Tank, Temporary Connection With Overhead Power Input, Cemig Standard, Load Installed From 15, 1Kva Up To 30Kva, Three-Phase, With Underground Outlet, Including Pole, Meter Box, Circuit Breaker, Busbar, Grounding And Accessories, Construction Shed For Storage And Type-Ii Tooling, Internal Area 25, 41M2, In Resin Plywood Sheet, Including Furniture (Medium-Sized Project, 30 A Effective 60 Men), Der-Mg Standard, Construction Shed For Type-I Contractors Office, Internal Area 18, 15M2, Including Furniture (Small To Medium Size Project, Effective Up To 60 Men) - Der-Mg Standard, Construction Shed For Type-I Inspection Office, Construction Shed For Type-Ii Sanitary Installation, In Resin Plywood Sheet (Work Of Medium Size, Work Shed For Type-I Canteen, Work Shed For Type-Ii Changing Room, Internal Area 67, 76M2, Shaft Rental, Land Cleaning, Including Weeding, Raking Up To Twenty (20) Meters Apart And Controlled Burning, Horizontal Excavation, Including Loading And Unloading On 1St Category Ground With A Tractor Tracks (100Hp/Blade: 2, 19M3). Af_07/2020, Mechanical Loading Of Material Of Any Nature On Truck, Exclusive Transport, Loading, Maneuvering And Unloading Of Rubble In 6 M³ Dump Truck - Loading With Hydraulic Excavator (0.80 M³ / 111 Hp Bucket) And Free Unloading (Unit: M3) Installation, Manual Trench Excavation. Af_09/2024, Mechanical Trench Excavation (Dry Soil), Depth Up To 1.50 M, Depth Between 1.50 And 4.00 M, Manual Loading (Material In General), Without Handling And Storage Of Material, Including Unloading, Unloading Of Material In General, In Bulk, By Dump Truck, Regularization And Manual Compaction Of Land, Embankment Of Trenches And Foundation Pits, With Control Of The Degree Of Compaction Of At Least 97% Of The Normal Proctor, Trench Shoring, Discontinuous Type, With A Depth Of Up To 1.5 M, A Width Of Less Than 1.5 M, With A Depth Of 1.5 M To 3.0 M, 5 M, Ballast With Granular Material (Medium Sand), Applied On Floors Or Slabs On Ground, Thickness Of *10 Cm*., Construction Of Manhole, Ø 0.60M, Up To 1.25M, From 1.25 To 2.00M, From 2.00 To 3, Circular Cover For Sewer And Drainage, In Cast Iron, Int Diameter
|