Installation Of 3,700 Lf Of 8¿ Cl350 Dip Water Main, 90 Meters, New Service Lines By Open Cut And Trenchless Applications, New Hydrants, Gate Valves And Additional Fittings, Testing. Installation Of 3,572 Lf Of 8¿ Gravity Main Through Open Cut And Trenchless Applications, The Installation Of 16 Manholes, The Installation Of 90 New Cleanouts, And All Other Equipment, Labor, Materials, And Testing To Complete The Work As Required In The Plans And Specifications. This Work Will Include The Installation Of A Stormwater Pond With Accompanying Outlet Control Structure And Headwalls, 337 Lf Of 42¿ Rcp, 709 Lf Of 36¿ Rcp, 687 Lf Of 30¿ Rcp, 354 Lf Of 24¿ Rcp, And 321 Lf Of 18¿ Rcp Through Open Cut Applications, The Installation Of Various Catch Basins And Junction Boxes That Remain In The Row, And All Other Equipment, Labor, Materials, And Testing To Complete The Work As Required In The Plans And Specifications. This Work Will Include ¾ Of A Mile Of Full Depth Paving Of Asphalt In The Roads, Removing And Replacing Any Existing Driveway Aprons On Roads A And C, Curb And Gutter Along The Paved Roads, Raising And Lower Valves/Manholes/Etc., And Installing New Signage And Striping.
Contact Information
Contact Person
Reshann Adams
Contact No.
7066476633
Email
radams@cityofthomaston.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111591349
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.