|
Design Supply Fabrication And Erection Of Mechanical Equipments-1 Excavation Earth Work In Excavation By Mechanical Means (Hydraulic Excavator)/Manual Means Over Areas (Exceeding 30 Cm In Depth, 1.5 M In Width As Well As 10 Sqm On Plan) Including Getting Out And Disposal Of Excavated Earth Lead Upto 50 M And Lift Upto 1.5 M, As Directed By Engineer-In-Charge. 2.6.1 All Kinds Of Soil 2 Earthfilling Filling Available Excavated Earth (Excluding Rock) In Trenches, Plinth, Sides Of Foundations Etc. In Layers Not Exceeding 20Cm In Depth, Consolidating Each Deposited Layer By Ramming And Watering, Lead Up To 50 M And Lift Upto 1.5 M. 3 Rccbreaking Demolishing R.C.C. Work Manually/ By Mechanical Means Including Stacking Of Steel Bars And Disposal Of Unserviceable Material Within 50 Metres Lead As Per Direction Of Engineer - In- Charge. 4 Pcc Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level - 1-3-6 (1 Cement -3 Coarse Sand (Zone-Iii) - 6 Graded Stone Aggregate 20 Mm Nominal Size) 5 Rcc Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete, Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement - All Work Up To Plinth Level - 1-1.5-3 (1 Cement - 1.5 Coarse Sand (Zone-Iii)- 3 Graded Stone Aggregate 20 Mm Nominal Size) 6 Sandfilling Supplying And Filling In Plinth With Sand Under Floors, Including Watering, Ramming, Consolidating And Dressing Complete. 7 Steelreinforcement Steel Reinforcement For R.C.C. Work Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete Above Plinth Level And Below Plinth Level.5.22A.6 Thermo-Mechanically Treated Bars Of Grade Fe-500D Or More 8 Shutteringbelowplinthlevel Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form As Per Directions Of Engineer-In-Charge At All Leads And Lift 5.9.1 In Foundations, Footings, Bases Of Columns (All The Below Plinth Level) Etc. 9 Shutteringaboveplinthlevel Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form As Per Directions Of Engineer-In-Charge At All Leads And Lift 5.9.6 Columns, Pillars, Piers, Abutments, Posts And Struts, (All The Above Plinth Level) 10 Drystonepitching Dry Stone Pitching 22.5 Cm Thick Including Supply Of Stones And Preparing Surface Complete 11 Grouting Providing And Grouting Of Pockets With Cementitious Grout Non Shrink Of Approved Make By Suitable Means Free Flowing Pump Curing Etc Complete As Per Directions Of Engineer In Charge The Payment Shall Be Made On The Basis Of Actual Weight Of Approved Grout Used As Per Directions Of Engineer In Charge 12 Cementpunning Neat Cement Punning. 13 Demolishingbrickwork Demolishing Brick Work Manually/ By Mechanical Means Including Stacking Of Serviceable Material And Disposal Of Unserviceable Material Within 50 Metres Lead As Per Direction Of Engineer-In-Charge 15.7.4 In Cement Mortar 14 Brickworkconstruction Brick Work With Non Modular Fly Ash Bricks Conforming To Is-12894, Class Designation 10 Average Compressive Strength In Super Structure Above Plinth Level Up To Floor V Level In - 15 Paintingonwalls Finishing Walls With Textured Exterior Paint Of Required Shade - 13.45.1 New Work (Two Or More Coats Applied At 3.28 Ltr/10 Sqm) Over And Including Priming Coat Of Exterior Primer Applied At 2.20Kg/ 10 Sqm 16 Finishpaintonwalls Finishing Walls With 100% Premium Acrylic Emulsion Paint Having Voc Less Than 50 Gm/Litre And Uv Resistance As Per Is 15489-2004, Alkali & Fungal Resistance, Dirt Resistance Exterior Paint Of Required Shade (Company Depot Tinted) With Silicon Additive New Work (Two Or More Coats Applied At 1.43 Litre/10 Sqm. Over And Including Priming Coat Of Exterior Primer Applied At 0.90 Litre/10 Sqm. 17 Cementplastering 15 Mm Cement Plaster With Mix -1-6 (1 Cement- 6 Fine Sand) At All Heights And Lead As Per Directions Of Engineer-In-Charge. 18 Randomrubblemasonry Random Rubble Masonry With Hard Stone In Foundation And Plinth Including Levelling Up With Cement Concrete 1-6-12 (1 Cement - 6 Coarse Sand - 12 Graded Stone Aggregate 20 Mm Nominal Size) Upto Plinth Level With 7.1.1 Cement Mortar 1-6 (1 Cement - 6 Coarse Sand) 19 Collapsablesteelshuttering Providing And Fixing In Position Collapsible Steel Shutters With Vertical Channels 20X10X2 Mm And Braced With Flat Iron Diagonals 20X5 Mm Size, With Top And Bottom Rail Of T-Iron 40X40X6 Mm, With 40 Mm Dia Steel Pulleys, Complete With Bolts, Nuts, Locking Arrangement, Stoppers, Handles, Including Applying A Priming Coat Of Approved Steel Primer. 20 Desingningpumpfoundation1 Designing Of Rcc Foundation For Peristaltic Pump For Existing Tank New 8V-2C/D/C With Vfd 80/80 21 Desingningpumpfoundation2 Designing Of Rcc Foundation Forperistaltic Pump For Decanter Solid Discharge Repulper Tank To Sdu Dissolution Tank 65/65 22 Desingningpumpfoundation3 Designing Of Rcc Foundation For Centrifugal Pump For Pumping Decanter Centrate To Sdu Thickener 80/40 23 Desingningpumpfoundation4 Designing Of Rcc Foundation For Centrifuge Feed Pump With Vfd Alloy 20 80/40 24 Desingningpumpfoundation5 Designing Of Rcc Foundation For Peristaltic Pump For H2So4 Dosing With Vfd 40/40 25 Desingningpumpfoundation6 Designing Of Rcc Foundation For Screw Pump 26 Desingningpumpfoundation7 Designing Of Rcc Foundation For Pump From Liquid Centrate Tank To Precipitation Tank Alloy 20 80/40 27 Desingningpumpfoundation8 Designing Of Rcc Foundation For Cloth Wash Water Pump With Motor (4.3 Lpm At4 Bar) 28 Desingningpumpfoundation9 Designing Of Rcc Foundation For Squeezing Water Pump With Motor 29 Desingningpumpfoundation10 Designing Of Rcc Foundation For Acidified Water Feed Pump Alloy 20 For Cake Wash 50/40 30 Desingningpumpfoundation11 Designing Of Rcc Foundation For Press Filter Feed Pump With Vfd Centrifugal Alloy 20 40/25 31 Desingningpumpfoundation12 Designing Of Rcc Foundation For Ai Filtrate To Dissolution By Pump Alloy 20 50/25 32 Desingningpumpfoundation13 Designing Of Rcc Foundation For Peristaltic Pump For Underflow With Vfd 40/40 33 Desingningpumpfoundation14 Designing Of Rcc Foundation For Cloth Wash Water Transfer Pump Alloy 20 50/25 34 Desingningpumpfoundation15 Designing Of Rcc Foundation For Cloth Wash Thickener Overflow Transfer Pump Alloy 20 50/25 35 Desingningpumpfoundation16 Designing Of Rcc Foundation For Peristaltic Pump For Pumping To Thickener With Vfd 65/65 36 Desingningpumpfoundation17 Designing Of Rcc Foundation For Flocculant Transfer Pump 37 Desingningpumpfoundation18 Designing Of Rcc Foundation For Flocculant Dosing Pump 38 Desingningpumpfoundation19 Designing Of Rcc Foundation For Peristaltic Pump For Naoh Peristaltic Pump With Vfd 40/40 39 Desingningpumpfoundation20 Designing Of Rcc Foundation For Peristaltic Pump For H2O2 Peristaltic Pump With Vfd 40/40 40 Desingningpumpfoundation21 Designing Of Rcc Foundation For Peristaltic Pump For Thickener U/F Pump With Vfd 65/65 41 Desingningpumpfoundation22 Designing Of Rcc Foundation For Peristaltic Pump For Pump To Existing Hbf Repulping And Washing Tank With Vfd 40/40 42 Desingningpumpfoundation23 Designing Of Rcc Foundation For Hot Water From Rotary Kiln To Cooling Tower Pump Cf8 43 Desingningpumpfoundation24 Designing Of Rcc Foundation For Cold Water From Cooling Tower To Rotary Kiln Pump Cf8 44 Desingningpumpfoundation25 Designing Of Rcc Foundation For H2O2 Unloading Pumps 80/50 45 Desingningpumpfoundation26 Designing Of Rcc Foundation For H2O2 Sump- Pumps 80/40 46 Desingningpumpfoundation27 Designing Of Rcc Foundation For H2O2 Transfer Pumps 80/50 47 Designingtankfoundation1 Designing Of Rcc Foundation For Hot Water Insulated Tank -Ss 304L 48 Designingtankfoundation2 Designing Of Rcc Foundation For Solid Discharge Tank For Decantor Solids With Agitator 1No -Ss-304L 49 Designingtankfoundation3 Designing Of Rcc Foundation For Decantor Filtrate Tank- Ss-304L 50 Designingtankfoundation4 Designing Of Rcc Foundation For 15M3 Dissolution Tank (Ef) -Ss316L 51 Designingtankfoundation5 Designing Of Rcc Foundation For H2So4 Tank, 2M3 Ms 52 Designingtankfoundation6 Designing Of Rcc Foundation For Liquid Centrate Tank, 15 M3 -Ss316L 53 Designingtankfoundation7 Designing Of Rcc Foundation For Centrifuge Solid Discharge I.E Ai Repulper Tank Ss316L 54 Designingtankfoundation8 Designing Of Rcc Foundation For Ai Filtrate Tank,2.0 M3 Ss316L 55 Designingtankfoundation9 Designing Of Rcc Foundation For Acidified Water Day Tank Ss316L 56 Designingtankfoundation10 Designing Of Rcc Foundation For High Density Spillage Thickener 1M X2.4 Mswd, 15 Degree Slope Ss 316L 57 Designingtankfoundation11 Designing Of Rcc Foundation For Cloth Wash Tank Ss316L 58 Designingtankfoundation12 Designing Of Rcc Foundation For Cloth Wash Thickener Overflow Tank -Ss-304L 59 Designingtankfoundation13 Designing Of Rcc Foundation For 15M3 Precipitation Tank ( Elevated Floor) Ss316L 60 Designingtankfoundation14 Designing Of Rcc Foundation For High Density Thickener 4M X3M Swd Ss 316L 61 Designingtankfoundation15 Designing Of Rcc Foundation For Naoh Tanks -Ss316L 62 Designingtankfoundation16 Designing Of Rcc Foundation For H2O2 Tank -Ss316L 63 Designingtankfoundation17 Designing Of Rcc Foundation For H2O2 Unloading & Transfer Tanks 64 Designingtankfoundation18 Designing Of Rcc Foundation For Thickener U/F Tank Ss316L 65 Designingtankfoundation19 Designing Of Rcc Foundation For Agitator For Sdu Repulping Tank, 3 No. Of Capacity 10M3 (2.2 M Dia X 2.9 M H) 66 Designingtankfoundation20 Designing Of Rcc Foundation Foragitated Hot Water Insulated Tank -Ss 304L 67 Designingtankfoundation21 Designing Of Rcc Foundation For Agitated Solid Discharge Tank For Decantor Solids With Agitator 1No -Ss-304L 68 Designingtankfoundation22 Designing Of Rcc Foundation For Agitated Decantor Filtrate Tank- Ss-304L 69 Designingtankfoundation23 Designing Of Rcc Foundation For Agitated 15M3 Dissolution Tank (Ef) -Ss316L 70 Designingtankfoundation24 Designing Of Rcc Foundation For Agitated Centrifuge Solid Discharge I.E Ai Repulper Tank Ss316L 71 Designingtankfoundation25 Designing Of Rcc Foundation For Agitated Cloth Wash Tank Ss316L 72 Designingtankfoundation26 Designing Of Rcc Foundation For Agitated 15M3 Precipitation Tank ( Elevated Floor) Ss316L 73 Designingtankfoundation27 Designing Of Rcc Foundation For Agitated Thickener U/F Tank Ss316L 74 Designingofequipmentfoundation1 Designing Of Rcc Foundation For Decantor 75 Designingofequipmentfoundation2 Designing Of Rcc Foundation For Centrifuge 76 Designingofequipmentfoundation3 Designing Of Rcc Foundation For Press Filter 77 Designingofequipmentfoundation4 Designing Of Rcc Foundation For Rotary Kiln 78 Designingofequipmentfoundation5 Designing Of Rcc Foundation For Compressor 79 Designingofequipmentfoundation6 Designing Of Rcc Foundation For Bag Filter 80 Designingofequipmentfoundation7 Designing Of Rcc Foundation For Pushh Fan 81 Designingofequipmentfoundation8 Designing Of Rcc Foundation For Pull Fan 82 Designingofequipmentfoundation9 Designing Of Rcc Foundation For Area Sump Pumps 83 Designingofstructuralplatform Designing Of Rcc Foundations,Design Of Structural Supports At 4.3 Meter Level For Supporting Tanks, Centrifugal Decantors, Tower Press Etc.. ,On Platform 84 Designofroofsheeting Designing For Roof Sheeting 85 Erectionofequipment1 Erection Along With Alignment Of Peristaltic Pump For Existing Tank New 8V-2C/D/C With Vfd 80/80 86 Erectionofequipment2 Erection Along With Alignment Of Peristaltic Pump For Decanter Solid Discharge Repulper Tank To Sdu Dissolution Tank 65/65 87 Erectionofequipment3 Erection Along With Alignment Of Centrifugal Pump For Pumping Decanter Centrate To Sdu Thickener 80/40 88 Erectionofequipment4 Erection Along With Alignment Of Centrifuge Feed Pump With Vfd Alloy 20 80/40 89 Erectionofequipment5 Erection Along With Alignment Of Peristaltic Pump For H2So4 Dosing With Vfd 40/40 90 Erectionofequipment6 Erection Along With Alignment Of Screw Pump 91 Erectionofequipment7 Erection Along With Alignment Of Pump From Liquid Centrate Tank To Precipitation Tank Alloy 20 80/40 92 Erectionofequipment8 Erection Along With Alignment Of Cloth Wash Water Pump With Motor (4.3 Lpm At 4 Bar) 93 Erectionofequipment9 Erection Along With Alignment Of Squeezing Water Pump With Motor 94 Erectionofequipment10 Erection Along With Alignment Of Acidified Water Feed Pump Alloy 20 For Cake Wash 50/40 95 Erectionofequipment11 Erection Along With Alignment Of Press Filter Feed Pump With Vfd Centrifugal Alloy 20 40/25 96 Erectionofequipment12 Erection Along With Alignment Of Ai Filtrate To Dissolution By Pump Alloy 20 50/25 97 Erectionofequipment13 Erection Along With Alignment Of Peristaltic Pump For Underflow With Vfd 40/40 98 Erectionofequipment14 Erection Along With Alignment Of Cloth Wash Water Transfer Pump Alloy 20 50/25 99 Erectionofequipment15 Erection Along With Alignment Of Cloth Wash Thickener Overflow Transfer Pump Alloy 20 50/25 100 Erectionofequipment16 Erection Along With Alignment Of Peristaltic Pump For Pumping To Thickener With Vfd 65/65 101 Erectionofequipment17 Erection Along With Alignment Of Flocculant Transfer Pump 102 Erectionofequipment18 Erection Along With Alignment Of Flocculant Dosing Pump 103 Erectionofequipment19 Erection Along With Alignment Of Peristaltic Pump For Naoh Peristaltic Pump With Vfd 40/40 104 Erectionofequipment20 Erection Along With Alignment Of Peristaltic Pump For H2O2 Peristaltic Pump With Vfd 40/40 105 Erectionofequipment21 Erection Along With Alignment Of Peristaltic Pump For Thickener U/F Pump With Vfd 65/65 106 Erectionofequipment22 Erection Along With Alignment Of Peristaltic Pump For Pump To Existing Hbf Repulping And Washing Tank With Vfd 40/40 107 Erectionofequipment23 Erection Along With Alignment Of Hot Water From Rotary Kiln To Cooling Tower Pump Cf8 108 Erectionofequipment24 Erection Along With Alignment Of Cold Water From Cooling Tower To Rotary Kiln Pump Cf8 109 Erectionofequipment25 Erection Along With Alignment Of H2O2 Unloading Pumps 80/50 110 Erectionofequipment26 Erection Along With Alignment Of H2O2 Sump- Pumps 80/40 111 Erectionofequipment27 Erection Along With Alignment Of H2O2 Transfer Pumps 80/50 112 Erectionofequipment28 Erection Along With Alignment Of Hot Water Insulated Tank -Ss 304L 113 Erectionofequipment29 Erection Along With Alignment Ofsolid Discharge Tank For Decantor Solids With Agitator 1No -Ss-304L 114 Erectionofequipment30 Erection Along With Alignment Of Decantor Filtrate Tank- Ss-304L 115 Erectionofequipment31 Erection Along With Alignment Of 15M3 Dissolution Tank (Ef) -Ss316L 116 Erectionofequipment32 Erection Along With Alignment Ofh2So4 Tank, 2M3 Ms 117 Erectionofequipment33 Erection Along With Alignment Of Liquid Centrate Tank, 15 M3 -Ss316L 118 Erectionofequipment34 Erection Along With Alignment Of Centrifuge Solid Discharge I.E Ai Repulper Tank Ss316L 119 Erectionofequipment35 Erection Along With Alignment Of Ai Filtrate Tank,2.0 M3 Ss316L 120 Erectionofequipment36 Erection Along With Alignment Of Acidified Water Day Tank Ss316L 121 Erectionofequipment37 Erection Along With Alignment Of High Density Spillage Thickener 1Mx 2.4 Mswd, 15Degree Slope Ss 316L 122 Erectionofequipment38 Erection Along With Alignment Of Cloth Wash Tank Ss316L 123 Erectionofequipment39 Cloth Wash Thickener Overflow Tank -Ss-304L 124 Erectionofequipment40 Erection Along With Alignment Of 15M3 Precipitation Tank ( Elevated Floor) Ss316L 125 Erectionofequipment41 Erection Along With Alignment Of High Density Thickener 4Mx 3M Swd Ss 316L 126 Erectionofequipment42 Erection Along With Alignment Of Naoh Tanks -Ss316L 127 Erectionofequipment43 Erection Along With Alignment Of H2O2 Tank -Ss316L 128 Erectionofequipment44 Erection Along With Alignment Of H2O2 Unloading & Transfer Tanks 129 Erectionofequipment45 Erection Along With Alignment Of Thickener U/F Tank Ss316L 130 Erectionofequipment46 Erection Along With Alignment Of Agitator For Sdu Repulping Tank, 3 No. Of Capacity 10M3 (2.2 M Dia X 2.9 M H) 131 Erectionofequipment47 Erection Along With Alignment Of Agitated Hot Water Insulated Tank -Ss 304L 132 Erectionofequipment48 Erection Along With Alignment Of Agitated Solid Discharge Tank For Decantor Solids With Agitator 1No -Ss-304L 133 Erectionofequipment49 Erection Along With Alignment Of Agitated Decantor Filtrate Tank- Ss-304L 134 Erectionofequipment50 Erection Along With Alignment Of Agitated 15M3 Dissolution Tank (Ef) -Ss316L 135 Erectionofequipment51 Erection Along With Alignment Of Agitated Centrifuge Solid Discharge I.E Ai Repulper Tank Ss316L 136 Erectionofequipment52 Erection Along With Alignment Of Agitated Cloth Wash Tank Ss316L 137 Erectionofequipment53 Erection Along With Alignment Of Agitated 15M3 Precipitation Tank ( Elevated Floor) Ss316L 138 Erectionofequipment54 Erection Along With Alignment Of Agitated Thickener U/F Tank Ss316L 139 Erectionofequipment55 Erection Along With Alignment Of Decantor 140 Erectionofequipment56 Erection Along With Alignment Of Centrifuge 141 Erectionofequipment57 Erection Along With Alignment Of Press Filter 142 Erectionofequipment58 Erection Along With Alignment Of Rotary Kelen 143 Erectionofequipment59 Erection Along With Alignment Of Compressor 144 Erectionofequipment60 Erection Along With Alignment Of Bag Filter 145 Erectionofequipment61 Erection Along With Alignment Of Pushh Fan 146 Erectionofequipment62 Erection Along With Alignment Of Pull Fan 147 Erectionofequipment63 Erection Along With Alignment Of Area Sump Pumps 148 Erectionofsteelstructures Fabrication& Erection, Painting Of Structural Steel Items 149 Erectionofroofsheets Roof Sheeting Work (To Be Billed After Completion Of Full Work Only) Erection 150 Erectionofequipment64 Erection Along With Alignment Of Capacity 5Mt, Rope Length - 12 Meters 151 Erectionofequipment65 Erection Along With Alignment Of Capacity 2Mt, Rope Length - 12 Meters 152 Erectionofequipment66 Erection Along With Alignment Of Electric Hoist Capacity 5Mt, Rope Length - 12 Meters 153 Erectionofequipment67 Erection Along With Alignment Of Electric Hoist Capacity 2Mt, Rope Length - 12 Meters 154 Supplyofsteelstructure Supply Of Structural Steel Of Various Sections As Per Approved Design Requirement 155 Supplyofroofsheets Supply Of Roof Sheets - Sheets Of Sizes 0.55Mm Thick , Along With 2 Number Of 4 Turbo Ventilators 156 Supplyofelectrichoist1 Supply Of Electric Hoist Capacity 5Mt, Rope Length - 12 Meters 157 Supplyofelectrichoist2 Supply Of Electric Hoist Capacity 2Mt, Rope Length - 12 Meters 158 Supplyofsteamprs Supply Of Steam (Automatic With Manual Over Ride ) Pressure Reducing Station Size 80Nb To Reduce Steam Pressure From 3.5 Bar - Up To 1.2 Bar For Water Heating 159 Desingingofpiperack Design Of Pipeline Routing For Process ,Steam And Instrumentation Air And Structural Support. 160 Erectionactivitiesofbagfilter Putting A 1800Mm Diameter And 750Mm Height With Flanges Ss -316 Cylinder Insert In The Existing Bag Filter With 1000 Mm Extension Of 400 Mm In Suction And Discharge Side. 161 Erectionoftank Erection Of Product Holding Tank. 162 Designofcompressorhouse Compressor House Design And Erection 163 Designofbagfilterduct Design Of Bag Filter Suction Duct 164 Submissionoffinalgaofequipmentlayout Submission Of Final Ga Of Equipment Layout.
|