|
Foul-Water Piping Construction Work – Proj. 22.627/1 & 22.627V/1 & Tur3015 - Merskplas, Road And Sewerage Works N132 + Koekhoven-Noord And Geheul. Proj. 22.627/1 & 22.627V/1 & Tur3015 - Merskplas, Road And Sewerage Works N132 + Koekhoven-Noord And Geheul. - Carrying Out Topographical Operations; - Carrying Out A Test Drainage; - Carrying Out Probe-Controlled Drainage, Return Drainage, Monitoring Settlements, Installing And Measuring Monitoring Wells, Taking Samples Of Drainage Water; - Supplying, Installing, Using And Removing Water Treatment Plants For Drainage Water; - Ensuring The Water Drainage Of The Existing Sewerage System And Cross-Watercourses; - Felling Trees, Shrubs And Hedges And Removing Stumps; - Carrying Out Test Trenches; - Breaking Up Pipes, Inspection Pits, Roadway And Roadside Pavements, Solids, Linear And Local Elements (Street Gullies, Traffic Islands, Signaling, Etc.), Stone Slopes Including Foundations And Sub-Foundations; - The Selective Milling And Removal Of Tar-Containing Kws Paving; - The Construction Of Sewers In Pp Pipes, Pvc Pipes, Unreinforced Concrete Pipes, Reinforced Concrete Pipes, Vitrified Clay Pipes, Pipes Made Of Filled And Glass Fiber Reinforced Polyester Resin And The Installation Of Inspection Wells, Access Wells And The Execution Of House And Street Gully Connections To The Sewer System And Foundation, Casing And Supplementation Thereof; - Carrying Out Watertightness Tests/Airtightness Tests Of Sewers; - Carrying Out Jacking With Pressing And Receiving Wells, Installation, ...; - Installing Pressure Pipes; - Renovation Of Sewers And Extensions Of Existing Culverts; - Constructing Pump Unit Pu1, Pu2, Pu3, Pd01, Pd02, Inspection Pits D0 And D1, In An Open Construction Pit; - Construction Of Pumping Stations Ps1, Ps2, Ps3, Ps4, Ps5, Ps6, Ps7, Ps8, Ps9 In Open Construction Pit; - Installing A Groundwater-Tight Sheeting For Structures And Access Or Connecting Pits In Open Construction Pits; - Carrying Out Earthworks (For Road And Sewerage Works) And Ground Improvement; - The Removal Of Soil Surpluses Cf. The Conditions And Guidelines Of The Temporary Framework For The Use Of, If Present, Pfas-Containing Soil Materials Become Applicable From This Date; - Installing Continuous Sheeting For Construction Trenches; - Applying Soil Improvement Techniques Under Foundation Pipes And Structures; - Installing Wooden Posts Under Foundation Pipes And Structures; - Placing Gravel Cores Under Foundation Pipes And Structures; - Clearing And Filling In Canals; - Construction Of Canals Including Slope And Soil Reinforcement; - Carrying Out Works On Watercourses; - Constructing Bicycle Bridges; - Construction Of End Walls In Reinforced Concrete; - Construction Of A Kws Paved Roadway And Parking Lane On A Foundation Of Poor Asphalt And Sub-Base; - Construction Of Cycle Paths In Asphalt Concrete On A Crushed Stone Foundation; - Construction Of Footpaths In Concrete Paving Stones On A Ste
|