|
5) Description Of The Subject Of The Order.1. The Subject Of The Procedure And Order Is To Select A Contractor For Construction Works Related To The Modernization Of The Jordanów Garden In The Estate. Wysokie, For The Municipal Greenery Management Board In Krakow. 1.1 Pursuant To Art. 310 Of The Public Procurement Act, The Ordering Party Provides For The Possibility Of Invalidating The Procedure In Question If The Public Funds That The Ordering Party Intended To Use To Finance All Or Part Of The Order Were Not Granted To It.1.2 The Subject Of The Proceedings And Order Is An Investment Related To The Implementation Of The Task Entitled: Zzm/Dir/O-Xvi-1/26 Construction And Reconstruction Of Jordan Gardens In District Xvi, And Zzm/O1.37/26 Areas Greenery And Recreation Of The City Of Krakow.1.3 The Investment Area Is Located On Plot No. 103/2, District 8, Unit Records: Nowa Huta. 1.4 The Scope Of The Subject Of The Order Includes: 1.4.1 Execution Of Construction Works In Accordance With The Available Design Documentation, Including In Particular: Earthworks, Tree Protection, Works Related To Land Development And The Construction Of A Safe Synthetic Epdm Surface, Construction Of Geogrid Surfaces, Dismantling Of: Playground Equipment, Benches With Backrests, Waste Bins, Dismantling Of A Fragment Of The Fence (3 Spans And 2 Posts) - Note! 2 Spans To Be Shortened And Reassembled, Installation Of Small Architecture Elements: Playground Equipment (Including Work On Delivering To The Construction Site And Installation Of The Playground Equipment - Swing, Storks Nest - Device Owned By The Investor), Sports Equipment, Benches, Bicycle Racks, Waste Bins, Renovation Of The Existing Playground Fence, Installation Of A New Entrance Gate In The Fence; Renovation Of Existing Benches With Backrests; Renovation Of The Existing Sandbox With A Fence, Reconstruction Of The Lawn, 1.4.2 Installation Of Small Architecture Elements, Optional Scope: Option 1: Earthworks, Purchase And Installation Of A Class Trampoline Based On The Attached Design Documentation, Including, Among Others: Necessary Opinions, Arrangements And Decisions.1.5 As Part Of The Order, The Basic Scope And Possibly The Scope Covered By The Option Law, In Whole Or In Part, Available To The Ordering Party (These Scopes Are Indicative Only And Their Exact Scope And Method Of Development Should Be Read From The Design Documentation), However: 1.5.1 Basic Scope - Includes Earthworks, Tree Protection, Works Related To Land Development And The Construction Of A Safe Synthetic Epdm Surface, Construction Of Surfaces With Geogrids, Dismantling: Playground Equipment, Benches With Backrests, Waste Bins, Dismantling A Fragment Of The Fence (3 Spans And 2 Posts) - Attention! 2 Spans To Be Shortened And Reassembled, Installation Of Small Architecture Elements: Playground Equipment (Including Work On Delivering To The Construction Site And Installation Of The Playground Equipment - Swing, Storks Nest - Device Owned By
|