|
Architectural, Construction, Engineering And Inspection Services - Kempten Clinic, Ba 8, Construction Of A Replacement Building, Building Part F - Structural Planning In Accordance With §§ 49 Ff Hoai 2021, Lph 2-6 When Commissioned In Stages And In Construction Phases. The Subject Of The Order Is The Services Of Specialist Structural Planning In Accordance With §§ 49 Ff Hoai 2021, Lph 2-6 For Step-By-Step And Construction Phase-By-Construction Orders. Klinikverbund Allgäu Gmbh Is Planning To Build The New Replacement Building, Building Part F, At The Kempten Clinic.------The Kempten Clinic Is A Specialized Hospital With 11 Main Departments And 5 Attending Departments. And Several Certified, Interdisciplinary Centers. Around 30,000 Inpatients Are Treated Every Year. The Kempten Clinic Ensures Medical Care Close To Home. Care For The Population, From Basic And Standard Care To High-Performance Medicine With Unique Features Such As: Supra-Regional Stroke Unit Care For Seriously Injured People From The Bg-9 Certified Organ Cancer Centers-Thrombectomy. The Clinic Campus Is Located Close To The Center On A Hill And Borders The Rottach Valley. The Geography Of The Location Creates Free Visual References To The Surrounding Area, But At The Same Time Poses Increased Requirements. To The Founding. The Existing F-Building In The North Of The Medical Campus Has The Building Structure From The Years 1960 - 1965 With Various Recent Renovations, Installations And Expansions. A Thorough Renovation Was Not Carried Out. The Flat Roof Building Has A Comb-Like Structure With 3 Inner Courtyards And External Dimensions. Of Approx. 84 X 40 M. There Are Up To 3 Basements Of Different Dimensions As Well As An Upper Floor Above The 2Nd Prong. The Building Is Connected To The Entrance Hall And, In Addition To The East-West Mainline, Has Two Connecting Bridges To The B And C Buildings. The Structure Corresponds To Todays Requirements In Terms Of Its Substance And Use. And The Space Required. In Addition, Structural, Functional And Hygienic Defects Give Rise To The Planning Of A New Building.------The Existing Components: The F-Building Was Built In Several Successive Construction Phases. Realized. In The Inventory Records. The Components Are Shaped Like This From West To East. Marked: - 1St And 2Nd Tines, Built Around 1960- 3Rd Tines, Built Around 1962- 4Th Tines And Entire North Clasp, Built Around 1964-----Construction Program / Functional Points: The Construction Program. Was Passed By The Ministry Of Health By Decision Of May 15, 2024. And Pfl. Approved. The Increase In Beds From 510 To 538 Planned Beds Takes Into Account The Elimination Of The Previous Ones. 3-Bed Room Structure To A 2-Bed Or 1-Bed Room Structure. The Following Functional Areas Are In The Existing. F Building And Are To Be Accommodated In The Replacement New Building: Central Patient Reception. (Zpa), Examination, Treatment (U+B), Doctors Service, Central Doctors Office / Telemedicine, Computer Tomography (Pet-Ct), Physiotherapy / Occupational Therapy, Prosecture, General Ward / Stroke Unit (Neurology And Stroke Unit), General Ward, General Ward (Surgery), Infectious Care (Oncology, Iso-Ward), Palliative Medicine, Higher-Level Rooms, Entrance Hall / Information, Sanitary Facilities, Communication & Interaction, Pastoral Care And Social Service, Staff Meals, Staff Changing Rooms, On-Call Service, Management And Administration, Services
|