|
Bids Are invited for The work of cutting and removing the wornout pipe line from half inch to 12 inches dia and installing the new pipe at the same place - fabrication , Fabricating and replacing wornout bands nipples crosses reducer with new one from half inch dia to 12 inches dia - fabrication , Renovation work of half inch to 12 inch diameter coils - fabrication , The work of fabricating and installing new flanges of 6 to 12 inches diameter - fabrication , The work of cutting and removing the 14 inch to 40 inch wornout pipe line and fabricating a new one and installing it at the same place - fabrication , Cutting and removing wornout bands nipples crosses tees reducer with new one from 14 inches to 40 inches dia and fabricating new ones and installing them at the same place - fabrication , The work of making and installing new flanges of 14 inches to 40 inches diameter in place of warn out flanges - fabrication , fabricate the round and square tank in the mill and installed it and put all the connections up to 01 meter - fabrication , fabricate the round and square tank in the mill and installed it and put all the connections above 1 meter diameter - fabrication , Strengthening with heavy structures at various places - fabrication , Strengthening with light structures at various places - fabrication , Strengthening and repairing wornout platform at various places - fabrication , Making and replacing manholes at various places - fabrication , replacing old and wornout cones at various places with new one and making it with 8 or 10 mm ms plate installing up to 01 meter - fabrication , replacing old and wornout cones at various places with new one and making it with 8 or 10 mm ms plate installing Above 01 meter - fabrication , Making and replacing wornout casing with newone and making it with 6 or 8mm ms plate at various places of fan - fabrication , Making and installing catchers at various stations including all connections - fabrication , Patching work of wornout equipment at various stations - fabrication , Replacing wornout truff of cane carrier baggase elivatore and rbc with new ms plate - fabrication , replacing wornout side plate with new ms plate of various places - fabrication , Replacing wornout runner base and installing a new runner base of Cane Carrier and Baggage Elevator and R B C - fabrication , Replacing wornout runner with new one of Cane Carrier and Baggage Elevator and R B C - fabrication , Removing wornout angle iron and T iron of the cane carrier and reinstalling it by straightening the crooked part - fabrication , Removing the wornout part of the suit from different places and fitting it with new one - fabrication , Chevron grooving of new rollers of the mill - fabrication , Chevron grooving of old rollers of the mill - fabrication , Remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it - fabrication , Installing ribs at the top and bottom partitions of the juice heater - fabrication , Repairing save all of qurdbody - fabrication , Removing old wornout gutters installed at various places and installing it with new gutters - fabrication , Remove the old wornout save all from pan and quard and install it with new one - fabrication , Reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one - fabrication , Replacement ribbon arm of the mascute receiving crystallizer - fabrication , Making new separator of A Centrifugal machine - fabrication , Removing the wornout truff of the hopper and installing it with new one - fabrication , Making and installing new separators for continuous centrifugal machines - fabrication , Removing the tubes of Quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of Size 42 mm - fabrication , Removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of Size 96 mm - fabrication , Removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates - fabrication , Removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate - fabrication , Removing the damaged boiler damper and installing a new one - fabrication , Making bagasse suit and installing. - fabrication , Replacement of juice over flow box of clarifier - fabrication , Making and installing bed of motor and pumps at various places as per requirement - fabrication , Replacement 6 inch dia cooling pipe of sulfur furnace - fabrication , Removing the monitor casing of A machine from old machine and installing it and giving its a trial - fabrication , Making amd replacing manholes at various places - fabrication , Making and replacing the enternals of cather of the pan. - fabrication , Making and replacing the new hood of cane cutter - fabrication , Removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial - fabrication , Reinstalling the stirrer of the clarifier and giving a satisfactory trial - fabrication , Removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones - fabrication , Removing and refitting the shaft of a Brown Sugar Magma mixer and installing with new bush - fabrication , Reinstalling the trufff of connecting rod of the hopper - fabrication , Making and installing new catcher strainer - fabrication , Removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level - fabrication , Reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc - fabrication , Removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement - fabrication , Cutting and straightening old plates installed at various places as per requirement - fabrication , Removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections - fabrication , Removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial - fabrication , Re-installation alignment and trial of hopper driving end - fabrication , Making and installing the top cover of the centrifugal machine - fabrication , Making an arm and installing it on the shaft of pug mill - fabrication , Making and installing scrubber and bottle jackets of sulfur furnace - fabrication , Making and installing drum type sulfur furnace - fabrication , Cutting out the corroded save all and making and fitting it with a new plate - fabrication , Modify the juice sulfiter by reducing the cell diameter as per the drawing - fabrication , Removing the screen of Old DSM and fitting a new one and replacing its wornout frame - fabrication , Removing the wornout mixed juice spreader installed in the mill and installing a new one as per the instructions - fabrication , Cleaning all the tubes of the transient heater and giving hydraulic testing - fabrication , Replacement and straighthening of wornout plate of unloader trolley - fabrication , Cutting out the corroded juice tray of Mill and installing a new one and giving satisfactory trial - fabrication , Installing guides on both sides of the chain near the cutter in the cane carrier - fabrication , Making and Replacing of wornout suit with new one of cane carrier - fabrication , Dismantling the wornout catcher of the quad s fourth body and making and installing its with new 8 mm plate - fabrication , Removing old and damaged gear of vacuum crystallizer and installing new gear doing alignment and giving satisfactory trial - fabrication , Making and installing the oil tray of mill house with new one. - fabrication , Making new frame of inter carrier using 8 mm plate and angle and channel - fabrication , Straightening of wornout columns of cane carrier and bagasse carrier approx 2 fit hight - fabrication Total Quantity : 80
|