Catenarys Construction Works – Campus Line Ta 1.2 Nossener Brücke/ Nürnberger Straße, Lot 1.4 Equipment Catenary Dvb Including Earthworks. Below Is A Summary Of The Rough Quantities For Lot 1.4: - Dismantle 1,390 M Of Single Contact Line Or Contact Wire Including Cross Structures - Dismantle 555 M Of Catenary - Dismantle And Dispose Of 38 Masts (1 Concrete, 37 Steel), Including Foundations - Dismantle 4 Steel Masts So That They Can Be Reused - Dismantle And Dispose Of 1 Collision Protection Contact Line Mast - 3 Strengthen Existing Masts By Painting - Clean 2 Pieces Of Foundation Pipe/Quiver (Existing) - Create 78 Pieces Of Pipe Foundation, Including Earthworks - Create 31 Pieces Of Block Foundation, Including Earthworks - 109 Pieces Of Steel Octagonal Masts As Insertion Masts, Deliver And Install; Of Which: 8 Pieces As Post-Tensioning Masts (Partially Combined With Lighting And / Or Lsa) 26 Pieces Combined With Public Lighting 17 Pieces Combined With Traffic Lights 6 Pieces Combined With Public Lighting And Traffic Lights 4 Pieces With Feed 3 Pieces With Route Separation - 10 Pieces Of Steel Octagonal Masts To Be Delivered And Installed As Top-Mounted Masts; Of Which: 2 Pieces As Post-Tensioning Masts, 4 Pieces Combined With Light Signal Systems - 2 Pieces Of Construction-Time Tensioning Masts At The Contractors Choice, Deliver, Install, Keep In Stock, Dismantle And Transport Away After Use - 1 Piece Of Collision Protection For Contact Line Mast, Deliver And Install - 3 Pieces Of New Construction Of Cross Structures For Ef (Transverse Spanning) - 1 Piece Of New Construction Of Cross Structures For Ef With Uri For Separation - 4 Pieces Of Cantilever Single Contact Line, Track, Deliver And Assemble - 1 Piece Of Boom For Single Contact Line, Two Tracks, Deliver And Assemble - 17 Pieces Of New Construction Cross Structures For Kf (Cross Fields) With One Or More Straightening Cables - 68 Pieces Of Boom For Catenary, One Track, Deliver And Assemble - 11 Pieces Of Boom For Catenary, Two Tracks, Deliver And Assemble - 7 Pieces Of Lsa Boom, Deliver And Assemble - 1 Piece Of Switch Position Signal Provided, Install - 39 1 Piece Of Bow Puller (Contact Wire Or Supporting Cable, Single Or Tip) Deliver And Install - 1 Piece Of Cross Beam / Traverse Dismantle, Store And Reassemble - 1 Piece Of Fixed Point For Chain Work, Two Tracks, In The Cross Section, Deliver And Install - 2 Pieces Of Wheel Tensioning, 1X10 Kn, Weight Guide In The Mast (Weights Semi-Circular), Supply And Install - 6 Pieces Of Wheel Tensioning, 2X10 Kn, Weight Guide In The Mast (Half-Round Weights), Deliver And Install - 2 Pieces Of Wheel Tensioning, 1X10 Kn, Weight Guide In The Mast (Round Weights), Supply And Install - 2 Pieces Of Spring Tensioning With Constant Tensile Force (Tensorex) Supply And Install - 800 M Of New Construction Of A Single Contact Line Including Electrical Connector, Regulation - 4,730 M Of New Construction Of Chain Work Including Hanger, Electrical Connector, Regulation - 205 M Lay Traction Power Cable - 4 Pieces New Construction Feed Point For Catenary, Two Tracks - 2 Pieces New Construction Section Separation For Catenary, Two Tracks - 1 Piece New Construction Section Separation For Single Contact Line, Two Tracks - 4 Pieces Supply And Install Section Separators - 1 Piece Switch Rod With Manual Drive On The Mast - 1
|