|
Part One Of The Order - Expansion Of Municipal Road No. 106097L Along With The Construction Of The Park&Ride And Bike&Ride Transfer Hub In Rudnik:1. Road Industry: - Expansion Of The Road Of The Municipal Road No. 106097L By Widening And Strengthening It Using Bituminous Layers Technology, Together With The Reconstruction Of The Inlet Of The Intersection With The Municipal Road No. 106096L - Total Area Of Bitumen Road No. 759 M2, - Construction Of The Road Of The Bus Terminus, Parking Bays, Parking Spaces, Exits With A Surface Made Of Concrete Paving Stones. 8 Cm - A Total Of Approximately 2,331 M2, - Construction Of Inclusions Into Municipal Roads, - Construction Of Sidewalks, Walkways, Places For Bus Shelters, Bicycle Shelter, Bicycle Repair Station And Toilets, With A Surface Made Of Concrete Paving Stones. 6 Cm, A Total Of Approximately 1217 M2, - Construction Of Open Roadside Ditches, - Reconstruction And Construction Of New Road Culverts - A Total Of 39 M, - Construction Of Covered Ditches Made Of Pp Pipes Ø40 Cm And Ø50 Cm With Inspection Wells - A Total Of 72 M, - Construction Of Storm Drains, Linear Curb Drainage, Linear Polymer Concrete Sewage, - Installation Of Small Architecture Elements, I.E. Shelters Bus Stop, Bicycle Shelter And Bicycle Repair Station, - Installation Of Road Lighting Poles With Led Luminaires, Hybrid Powered 18 Pcs. - Installation Of Vertical And Horizontal Markings, - Installation Of Road Traffic Safety Devices, - Implementation Of Demolition Works Of The Existing Bus Terminus, Road With Road Slabs, Fences And Felling Of Trees.2. Power Industry (Reconstruction Of The Power Grid - Removal Of Conflicts): - Reconstruction Of 15 Kv Mv Cable Lines With Cable Ducts For Optical Fibers, - Reconstruction Of 0.4 Kv Lv Cable Lines, - Reconstruction Of The 0.4 Kv Lv Cable And Measurement Connector, - Reconstruction Of Road Lighting (3 Lighting Poles, Cable Lines).3. Sanitary Industry (Reconstruction Of The Gas And Heating Networks - Removal Of Conflicts): - Dismantling The Existing Gas Network Dn25, Dn50, - Reconstruction Of The Existing Gas Network Colliding With The Designed Road System, Diameter: Dn50 Steel, - Dismantling The Existing Heating Network.4. Sanitary Industry (Reconstruction Of The Water Supply Network - Removal Of Conflicts): - Dismantling The Existing Water Supply Network Dn40, Dn50 - Reconstruction Of The Existing Water Supply Network Colliding With The Designed Road System, Diameter: Dn63 L = 83.70 M.5. Carrying Out Additional Works Not Described In The Design And Bills Of Quantities: 1) Partial Renovation Of The Edge Of Municipal Road 106096L (Near The Culvert), 1 M Wide And 10 M Long. Partial Renovation Includes Replacement Of The Surface (Surface Crack) And Replacement Of The Substructure (Loss Of Load-Bearing Capacity). It Is Required To Perform Construction Layers As For Structural Section No. 8 Of Municipal Road 106096L.2) Height Regulation Of Sanitary Sewage Wells. (The Height Of The Sewage Pumping
|