|
Solar Photovoltaic Modules – Installation Of Photovoltaic Panels, Energy Storage And Energy Management System. 4.3. The Subject Of The Order Includes: Building 27 - Effective Installation Area 812 M2, Installation Capacity Min. 87.4 Kwp, Energy Storage Min. 90 Kwh Building 15 - Effective Installation Area 400 M2, Installation Power Min. 43.7 Kwp And Energy Storage Minimum 45 Kwh, Building 18 - Effective Installation Area 839 M2, Installation Power Min. 97.52 Kwp And Energy Storage Min. 100 Kwh. Building 29 - Effective Installation Area 480 M2, Installation Power Min. 54.28 Kwp And Energy Storage Of Min. 60 Kwh Building 20 - Effective Installation Area Of 140 M2, Installation Power Of 13.80 Kwp, And Energy Storage Of Min. 15 Kwh 1) As Part Of The Subject Of The Order, Within The Scope Of Design Works, The Contractor Will Perform: - Inventory Of The Actual Technical Condition Of Facilities For The Installation Of Pv Systems And Energy Storage On The Day Of Commencement Of Installation Of The Installation, - Inventory Of The Actual Condition Of The Facilities Electrical Installation In Terms Of Installation Of Pv Systems, 2) As Part Of The Subject Of The Order, In The Scope Of Execution Works, The Contractor Will Perform The Following Installation Works, Including The Investment Addresses Indicated In The Fup: − Verification Of The Technical Condition Of The Electrical Installation In Individual Buildings, − Construction Of The Necessary Structures For The Installation Of Photovoltaic Modules, − Installation Of Photovoltaic Modules On The Structure, − Assembly And Installation Of Energy Storage Facilities, − Installation Of Inverters/Inverters For The Photovoltaic Installation, − Laying The Cabling For Connecting Photovoltaic Modules, − Connecting Inverters/Inverters Of Photovoltaic Modules To The Investors Power Grid, − Modernization Of Electrical Switchboards In Individual Buildings, − Installation Of An Automation System, − Modernization Of The Hospitals Main Switchboard To The Necessary Extent, − Carrying Out Installation Tests And Checking The Proper Operation Of The Equipment, − Commissioning Of The Pv System And Energy Storage Facilities And Regulation, − Training Of The Staff, − Carrying Out The Necessary Arrangements And Submitting Complete Documentation To The Dso, Together With Successfully Completing All Formalities With The Distribution System Operator (Dso) Allowing For Operation Of The Described Installations; 3) As Part Of The Subject Of The Order, In The Scope Of Construction Works, The Contractor Will Perform The Following Works At The Investment Addresses Indicated In The Ffu: − Construction Of The Necessary Structures For The Installation Of Fv Panels, − Construction Of Passages Through Partitions (Ceiling, Roof, Walls) For The Laying Of Electric Cables And Their Protection, − Sealing Of Culverts In The Places Of Cable Passages, − Performance Of Cleaning Works Aimed At Tidying Up The Construction Site And Restoring The Facility To Its Original Condition. 4) The Ordering Party Requires That The Central Bms System Supports All Five Energy Storage Facilities And Related Photovoltaic Installations And Ensures Safe, Stable And Optimal Operation Of The Entire System. The Bms System Must Meet The Following Functional Requirements: − Monitoring Of Operating Parameters - Voltage, Current, Cell Temperature And Charge Status
|