|
1. The Subject Of The Order Is The Reconstruction Of District Road No. 1500E On The Section From The Intersection In Piekary To The Roundabout In Ostrołęka, With A Length Of 2040 Meters, Including In Particular: 1) Surface Milling, 2) Construction Of A New Bituminous Road Surface With An Asphalt Concrete Wearing Course - Thickness. 4 Cm And A Binding Layer Of Asphalt Concrete - Thickness. 8Cm,3) Construction Of Exits To The Plots,4) Construction Of Exits To Access Roads,5) Construction Of A 1.8M Wide Sidewalk,6) Construction Of Roadsides Made Of Crushed Aggregate,7) Construction Of Pedestrian Crossing Lighting,8) Construction Of Rigid Protective Handrails Behind The Bus Stop Platform,9) Vertical Adjustment Of Manholes For Sewer Manholes,10)Cleaning Ditches Of 30 Cm Thick Silt With Profiling Of The Ditch Slopes, 11) Cleaning Of Culverts With A Diameter Of 0.4 M Of Silt, 12) Renovation Of Field Stairs At Plots No. 179 And 163/2 Along With The Installation Of A One-Sided Barrier (Handrail), 13) Extension Of The Existing Culvert Under The Road With Backfilling, 14) In The Area Of The Bus Stop, Strengthening The Slope Behind The Newly Built Sidewalk - Openwork Concrete Slabs 50 M2, 15) Dismantling And Reassembly Bus Shelter, 16) Installation Of Vertical And Horizontal Thick-Layer Markings, 17) Performance Of Repair Works On The Existing Bicycle Path: A) Height Adjustment Of Curb Inlets - 9 Pieces, B) Replacement And Height Adjustment Of Curbs - 20 M, C) Relocation And Height Adjustment Of The Concrete Pavement On The Bicycle Path - 16 M2, 18) Construction Of Two Information Boards (Template For Arrangements At The Implementation Stage). Note: The Wearing Course Should Be Applied Over The Entire Width Of The Road, I.E. On Both Road Lanes Simultaneously. During The Works, The Road Will Be Temporarily Closed To Traffic. The Contractor Is Obliged To Immediately Inform The Relevant Road Administration Authorities About The Planned Road Closure And Obtain The Necessary Permits. Due To The Need To Temporarily Close The Road To Traffic, The Contractor Undertakes To Agree With The Relevant Services And Public Administration Bodies On How To Organize Traffic And Establish Detours For Road Users. These Activities Include, Among Others: Establishing Detour Routes, Necessary Signage And Information Activities For Residents And Road Users.2. A Detailed Description Of The Subject Of The Order Is Included In The Draft Provisions Of The Contract And Technical Documentation, Which Consists Of The Following Documents: - Construction Design, - Detailed Design, - Permanent Traffic Organization Design, - Technical Specification For The Execution And Acceptance Of Construction Works, - Geotechnical Opinion, - Certificate Of Acceptance Of The Reconstruction Application Without Objection, Ref. Ab.6743.4.809.2025.Jt Of 07/08/2025 Due To The Fact That The Contractors Remuneration Indicated In The Offer Will Be A Lump Sum, When Pricing The Offer, The Contractor Should Rely On Th
|