|
The Building In Question, In Which The Existing Boiler Room Is Located, Which Will Be Subject To Reconstruction With A Change In Use, Is A Detached Structure Of A Two-Winged Structure Connected By A Connector, In The Part Where The Boiler Room Is Located, The Building Has One Floor -1 (Basement At -1.50 M) Which Extends Partly Into Two Floors (I.E. Basement And Ground Floor) With A Height Of 6 M, And In Part The Ground Floor On Level +-,0.00M Accessible From The Ground Level, And By Stairs From The Basement Level. The Building Is Made Of Brick, With Existing Reinforced Concrete Ceilings, An Existing Gable Roof With A Wooden Structure, Covered With Sheet Metal, Placed On Existing Concrete Foundations. The Scope Of The Project Is Consistent With Decision No. P/16/25 On Determining The Location Of A Public Purpose Investment Of October 30, 2025, Ref. No.: Pgs.6733.16.2025 Issued By The Mayor Of The City And Lesko Commune And Decision No. 22/26 Of The Building Permit Of February 11, 2026 Issued By The Starosta Of Lesko, Reference Number Ab.6740.1.101.2025. 4.2. The Subject Of The Order Includes In Particular: - Execution Of Earthworks And Foundations, - Construction Of Reinforced Concrete Structures (Slabs, Walls, Columns, Ceilings), - Installation Of Structural Steel Elements, - Construction Of A Reinforced Concrete Ramp With Balustrades, - Construction Of A Paving Stone Surface Within The Exit Area, - Construction Of New Floors And Anti-Moisture And Thermal Insulation, - Execution Of Finishing Works (Plasters, Painting, Cladding, Suspended Ceilings), - Installation Of Windows And Doors (Including Doors With The Required Fire Resistance), - Insulation Of The Facade And Foundation Walls Along With Sheet Metal Work. Execution Of Electrical Installation Works - The Scope Of Works Includes In Particular: - Construction Of Wlz And Integration With The Existing Pwp Switch, - Sp Cabinet According To Separate Procedure And Study, - Installation Of Switchboards In The Tr1 Building, Tb, - Construction Of Cable Routes Supplying Electrical Devices, - Installation Of Internal Lighting, - Installation Of Power Supply For Power Devices And Plug Sockets, - Implementation Of Grounding Installations, Equipotential Connections - Implementation Of Ssp Installation, - Implementation Of Monitoring Installation, - Access Control Installation, - Installation Of A Flood Detection System. Adaptation Of Water And Sewage Infrastructure: - Dismantling Of Obsolete Installations, - Implementation Of A New Sewage System. Sanitary Installations, - Construction Of Cold And Hot Water Installations With Shut-Off And Safety Fittings, - Installation Of An Electric Heater And A Sewage Pumping Device, - Performance Of Tightness Tests And Disinfection Of The Installation. Construction Of A Central Heating Installation: - Installation Of Steel Pipelines, - Installation Of Radiators With Regulating Fittings, - Installation Of Thermal Insulation, - Testing And Adjustment Of The Installation.
|