|
Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Polyethylene Water Tank, 1000 Liters - Supply And Installation. Af_06/2021, Temporary Wooden Structure To Support A 1000 Liter Elevated Water Tank. Af_03/2024, Siding With Metallic Tile. Af_03/2024, Mechanized Cleaning Of Plant Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), Using A Tracked Tractor. Af_03/2024, Mechanized Trench Excavation With Prof. Up To 1.5 M (Average Upstream And Downstream/One Composition Per Section), Backexcavation. (0.26 M3), Width. From 0.8 M To 1.5 M, On 1St Category Soil, In Locations With A High Level Of Interference. Af_09/2024, Preparation Of The Bottom Of A Trench With A Width Greater Than Or Equal To 1.5 M And Less Than 2.5 M (Natural Soil Adjustment). Af_08/2020, Mechanized Trench Backfilling With Hydraulic Excavator (Bucket Capacity: 0.8 M³/Power: 111 Hp), Width Up To 1, Depth 1.5 To 3.0 M, With Soil (Without Replacement) Of 1St Category, With Percussion Soil Compactor. Af_08/2023, Loading, Maneuvering And Unloading Soil And Granular Materials In A 10 M³ Dump Truck - Loading With Hydraulic Excavator (1, 20 M³ / 155 Hp Bucket) And Free Unloading (Unit: T). Af_07/2020, Transport With 10 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: Txkm). Af_07/2020, Assembly And Disassembly Of Formwork For Rectangular Pillars And Similar Structures, Simple Straight Leg, Made Of Resin Plywood Sheet, 2 Uses. Af_09/2020, Assembly And Disassembly Of Beam Formwork, Metal Shoring, In Resin Wood Sheet, Assembly And Disassembly Of Solid Slab Formwork, In Sawn Wood, Mechanical Soil Compaction For Execution Of Radier, Concrete Floor Or Slab On Soil, With Vibrating Plate Type Soil Compactor. Af_09/2021, Separator Layer For Radier Execution, In Plastic Canvas. Af_09/2021, Frame For Radier Execution, Using Q-196 Screen. Af_09/2021, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 5.0 Mm Ca-60 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 6.3 Mm Ca-50 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 8 Ca-50 Steel, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 10 Ca-50 Steel, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 12.5 Mm Ca-50 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 16 Ca-50 Steel, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 20 Steel, Slab Frame Of Conventional Reinforced Concrete Structure Using Ca-50 6 Steel, Slab Frame Of Conventional Reinforced Concrete Structure Using Ca-50 Steel Of 10, Slab Frame Of Conventional Reinforced Concrete Structure Using Ca-50 Steel Of 12, Slab Frame Of Conventional Reinforced Concrete Structure Using Steel Ca-60 Of 5, Unidirectional Precast Slab, Bi-Supported, For Floor, Ceramic Filling, Conventional Joist, Total Slab Height Lt = 12 Cm (Filling+Cover) = (8+4). Af_08/2025, Radier Concreting, Fck 30 Mpa - Laying, Densification And Finishing. Af_09/2021, Supply And Application Of Machined Concrete Fck=30 Mpa - Considering Pumping (5% Losses Already Included In The Cost) (6% D
|