Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Water Measuring Easel Kit - Individual Entry, In Cpvc Dn 28 Mm (1), For 1 Meter - Supply And Installation (Exclusive Hydrometer). Af_03/2024, Hydrometer Dn 1/2, 1.5 M3/H - Supply And Installation. Af_03/2024, Electricity Input, Overhead, Three-Phase, With Recessed Box, 10 Mm2 Cable And Din 50A Circuit Breaker (Concrete Post Not Included). Af_07/2020, Open Shed To Support Production (Carpentry, Armature Center, Workshop, Etc.) W/ Scissors, 4Mm Tile, Bleached Concrete Floor, 03/31/2026 - 15:47:14, Shed For Medium-Sized Works Reused 2 Times, Shed For Bathroom And Construction Changing Room, S35, 10M², Capacity For 20 Workers With New Materials, Local Administration, Mechanized Excavation For Crowning Block Or Footing With Backhoe Loader (Including Excavation For Placing Formwork). Af_01/2024, Preparation Of The Bottom Of A Trench With A Width Of Less Than 1.5 M (Adjustment Of The Natural Soil). Af_08/2020, Slim Concrete Ballast, Applied To Crowning Blocks Or Footings, 5 Cm Thick. Af_01/2024, Manufacture, Assembly And Disassembly Of Shoe Formwork, Made From Resin Plywood Sheet, E17 Mm, 4 Uses. Af_01/2024, Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 6.3 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Concreting Shoe, Fck 20 Mpa, Using Jerica - Laying, Densifying And Finishing., Manual Backfilling Of Trenches, With Percussion Soil Compactor. Af_08/2023, Manual Excavation For Baldrame Beam Or Running Footing (Including Excavation For Placing Formwork). Af_01/2024, Assembly And Disassembly Of Formwork For Baldrame Beam, In Sawn Wood, E25 Mm, Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, Concreting Of Crowning Block Or Baldrame Beam, Plating Applied To Masonry And Internal Concrete Structures, Using A Trowel. Mortar Trace 1:3 With Manual Preparation. Af_10/2022, Surface Waterproofing With Cement Mortar And Sand, With Waterproofing Additive, And 1.5Cm. Af_09/2023, Surface Waterproofing With Asphalt Emulsion, 2 Coats. Af_09/2023, Assembly And Disassembly Of Formwork For Rectangular Pillars And Similar Structures, Simple Right Foot, 8 Uses. Af_09/2020, Assembly And Disassembly Of Beam Formwork, Without Propping, Made Of Resin Wood Sheet, 8 Uses., Propping With Wooden Fork, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 5.0 Mm Ca-60 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 6.3 Mm Ca-50 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 8 Steel, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 10 Steel, Unidirectional Precast Slab, Bi-Supported, For Flooring, Ceramic Filling, Conventional Joist, Total Slab Height (Filling+Cover) (8+4). Af_11/2020, Concreting Of Pillars, Using Buckets - Launch, Concreting Of Beams And Slabs, Fck20 Mpa, For Any Type Of Slab With Buckets In A Ground Floor Building - Launch, Masonry For Sealing Ceramic Blocks
|