The Subject Of The Order Is The Renovation Of The Roof, Chimneys And Gable Wall In Kończyce 5, Plot No. 8, Nowe Commune, Poviat. Świecie, (Inventory No. 52/0604), Kuyavian-Pomeranian Voivodeship. The Subject Of The Order Includes, Among Others: Scope Of Work - Roof Covering: 1. Demolition Of The Existing Roof Covering Made Of Onduline Boards Along With Dismantling Of The Lath, 2. The Existing Roof Structure Has Been Qualified For Preservation, During The Works The Wooden Structure Should Be Re-Inspected, In Case Of Doubts As To The Technical Condition Of The Structural Elements, Call On The Authors Supervision To Develop A Further Work Program, 3. Clean The Wooden Structure With Steel Brushes And Paint, Among Others. 2 Times Generally Available Fire Protection Measures. Wood, The Color Of The Impregnation Is Colorless, 4. Making A Full Formwork With A Thickness Of 25 Mm, Made Of Pressure-Impregnated C24 Class Wood, 5. Laying On The Formwork A Structural Mat Dedicated To Sheet Metal Roofing, 6. Making A Roof Covering Made Of Galvanized Flat Steel Sheet From A Roll With A Thickness Of Min. 0.55 Mm, Natural Color, Double Standing Seam On Previously Made Formwork, 7. Sheet Metal Flashings Made Of Galvanized Steel Sheet, Natural Color, Min. Thickness. 0.55Mm, 8. Installation Of Gutters And Downpipes - On The Main Body, Semi-Circular Gutters With A Diameter Of 150Mm And Downpipes - Round With A Diameter Of 120Mm; On The Annexes, Semi-Circular Gutters With A Diameter Of 120 Mm And Round Downpipes With A Diameter Of 100 Mm, Gutters Made Of Galvanized Steel Sheet In A Natural Color, With A Thickness Of Min. 0.55 Mm, 9. Construction Of 2 Pieces Of Roof Hatches (Rear Slope) To Enable Trouble-Free Chimney Sweep Service, 10. Execution Of Roof Communication In The Color Of The Roof Covering Using Systems Dedicated To Sheet Metal Roofing, For The Roof Communication System The Contractor Must Provide A Technical Card And A Declaration Of Conformity To The Ordering Party, 11. Implementation Of Snow Protection - A Snow Catcher System Should Be Installed In Two Rows According To Manufacturers Instructions, Color Similar To The Color Of The Roof Covering, 12. Construction Of A New Lightning Protection Installation With Earthing Electrodes, After Completing The Installation, The Contractor Should Carry Out Acceptance Measurements By A Person With Appropriate Authorizations, The Results In The Form Of A Report Should Be Provided To The Ordering Party As Part Of The As-Built Documentation. Scope Of Works - Chimneys: 1. Re-Building Of Chimneys Above The Roof Slope And Approx. 1 M Below The Slope, Re-Building Made Of Solid Ceramic Bricks. Min. Class 20 On Cement And Lime Mortar With A Full Joint, Keep The Original Dimensions Of The Chimneys (Length, Width, Height), Do Not Plaster The Chimneys. Scope Of Work - Wooden Gable Wall: 1. Dismantling The Existing Wooden Gable Wall From The Eastern Side, The Supporting Structure Should Be Cleaned With Steel Brushes And Inspected;
|