The Subject Of The Proceedings Is The Thermal Modernization And Renovation Of A Building In Kołaczków As Part Of The Investment Task Strengthening Social And Environmental Protection Systems In The Opinogóra Górna Commune. The Scope Of Works Includes: 1) Thermal Modernization Of The Building - External Works: A) Dismantling/Taking Down The Brick Cornice Under The Gutter Flashing, B) Dismantling/Taking Down The External Concrete Window Sills In The Windows Of The Building, C) Dismantling And Reinstallation Of Antennas On The Walls Of The Building, D) Demolition Of Existing Stairs, Hardening And Masonry Elements At The Building Along With The Disposal Of Demolition Materials, E) Insulating The Foundation Walls Of The Building With 15 Cm Thick Styrofoam With Excavation, Cleaning And Making 2X Moisture-Proof Insulation Of The Foundation Walls, F) Insulating The External Walls Of The Building With 18 Cm Thick Styrofoam, G) Insulating The External Columns (Sides And Rear) At The Entrance To The Building 10 Cm Thick Styrofoam, H) Replacing The Entrance Door To The Building With Aluminum Doors, I) Replacing Window Frames In External Walls, J) Applying Silicate Plaster On External Walls On Prepared Surfaces Finished With Mesh And Glue, K) Applying Resin Plaster On The Plinths Of Foundation Walls On Surfaces Made With Bucket Foil, L) Dismantling And Installing New External Window Sills (Made Of Coated Sheet Metal) And Internal (From Conglomerate),M) Construction Of A Band Around The Building From Concrete Paving Stones,N) Construction Of New Stairs And Ramps With A Surface Made Of Concrete Paving Stones With Painted Steel Balustrades,O) Extension Of Ventilation Passages Through The External Walls,P) Construction Of Roofs Over The Entrances In The Side Walls,Q) Replacement Of External Lighting Fixtures On The Walls Of The Building;2) Renovation Of Rooms Inside The Building: A) Removal Of Existing Layers Of Floors And Plasters,B) Installation Of Layers Floor Coverings, C) Construction Of New Partition Walls With Installation Of Prefabricated Door Lintels And Brickwork, D) Construction Of New Installations Of Devices: Electrical, Water And Sewage, Central Heating, Ventilation With Repair Of Installation Passages Through The Walls E) Plastering Of Walls, F) Construction Of Suspended Ceilings, G) Construction Of Wall Cladding, H) Painting Of Walls, I) Installation Of Doors, J) Installation Of Equipment: Stove, Sink With Cabinet (Siphon + Faucet), Shower Tray With Cabin (Siphon + Faucet), Toilet, Washbasin (Siphon + Faucet),K) Installation Of Electrical Equipment (Including Lighting),L) Replacement Of Lighting Fixtures,M) Construction Of Ventilation Passages Through The Ceiling And Roof,N) Insulation Of The Attic Floor Surface With Rock Mineral Wool,O) Construction Of A Wooden Grate Along With The Construction Of The Floor Above The Insulation With Wool From The Board Osb; 3) Installation Of A Heat Pump. A Detailed Description Of The Elements Of The Subject Of T
|