The Subject Of The Order Is The Preparation Of Complete Design Documentation (Hereinafter Referred To As The Documentation), Together With Obtaining Opinions, Arrangements And Administrative Decisions Required By The Provisions Of The Construction Law, As Well As Providing Authors Supervision For The Task: Reconstruction Of Forest Road No. 7 In The Bogusza Forest (Inventory No. 220/663)1. Task Description: The Task Involves The Reconstruction Of Forest Road No. 7 In The Bogusza Forestry, The Aim Of Which Is To Maintain Passability And Adapt The Road Parameters To Enable High-Tonnage Transport. It Is Planned To Rebuild The Substructure And Surface Of The 3.0 M Wide Forest Road And Rebuild The Culverts. The Task Will Include Reconstruction Of The Subgrade With Crushed Aggregate And Construction Of A Surface Made Of Crushed Aggregate. Construction Of Longitudinal And Transverse Drainage Using Pipe Culverts With Stonework Structures And Water Outlets. The Parameters Of The Culverts, Their Capacity And The Type Of Technology Used Will Be Determined By The Designer In The Construction Design. 2. Type Of Investment: Reconstruction 3. Investment Location: Bogusza Forestry, Bogusza District, Section 46A, 45F,C,H, 42G, Plot No. 672,670,678,676, Proximity Of Protected Areas - None, Mountainous Area 4. Basic Parameters Of The Road: Length 1973 M, Road Width 3.00 M, Shoulder Width 0.20 M, 5. Type Of Existing Surface1: Improved Dirt6. Planned Road Reconstruction Technology For Each Layer • Subbase - Crushed Aggregate 31.5-63 Mm • Surface Crushed Aggregate 0-31.5 Mm 7. Components Of The Task: Number And Type Of Road Engineering Structures (E.G. Transhipment Depots, Extended Exits, Maneuvering Areas, Ditches). • Pipe Culverts - 2 Pcs. • Inlet Wells - 2 Pcs. • Water Drains - 30 Pcs. • Ditch Along The Entire Length Of The Road • Exits To Logging Routes - 3 • Wood Depots - 3 • Reconstruction Of The Substructure Along The Entire Length Of The Road • Reconstruction Of The Surface Along The Entire Length Of The Road 2. The Documentation Will Include: Design Documentation Including: • Construction Design To The Extent Taking Into Account The Specificity Of Construction Works, • Design Executive,• Technical Specification For The Execution And Acceptance Of Works (Stwior), The Contractor Will Be Obliged To Make Changes And Update The Project If Necessary Within 7 Days From The Date Of Order By The Forest District As Part Of The Remuneration Received For The Prepared Documentation. Cost Estimate Documentation Containing:• Investors Cost Estimate Prepared In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On Determining The Methods And Basis For Preparing A Cost Estimate. Investor, Calculating The Planned Costs Of Design Works And The Planned Costs Of Construction Works Specified In The Functional And Utility Program (Journal Of Laws Of 2021, Item 2458), • Bill Of Quantities, Which Should Include A List Of The Basic Works T
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111169949
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.