|
1. The Subject Of The Order Is The Implementation Of An Investment Task Entitled: Implementation Of Construction Works For The Tasks Entitled: Renovation And Retrofitting Of The Playground At Wybicki Square As Part Of The Citizens Budget 2024 And Gardens For Butterflies At The Playground At Wybicki Square As Part Of The Green Citizens Budget 2024. The Subject Of The Order Is The Renovation Of The Playground Located At General Józef Wybicki Square In Gdańsk. The Subject Of The Order Should Include, Among Others: • Protection Of Existing Greenery, • Maintenance Cuts And Clearing Of Greenery, • Protection Of Underground Infrastructure, • Dismantling Of Existing Landscaping Elements, • Installation Of New Landscaping Elements, • Rearrangement Of Existing Landscaping Elements, • Construction Of A Pedestrian Route And Pavement, • Planting Of Plants, Including Tree Plantings, • Renovation Of The Existing Fence Of The Playground, • Restoration, Cleaning And Tidying Up The Area After The Works Have Been Completed. Works. The Subject Of The Order Includes All Works, Activities And Construction And Assembly Works Related To Land Development And Shaping Of Green And Recreational Areas, Necessary To Perform The Investment Task Based On The Approved Design Documentation To The Extent Indicated By The Ordering Party In The Swz Together With Annexes, In Particular In The Description Of The Subject Of The Order.2. The Material Scope Of The Order Includes All Works, Activities And Works Necessary To Complete The Investment Task, Including The Following Elements: A. Securing The Existing Greenery, Trees And Shrubs Before The Commencement Of Construction Works, B. Maintenance Cuts Of 5 Trees In Accordance With The Greenery Inventory, C. Cutting Down 9.4 M Of Five-Leaf Vine, D. Securing Underground Infrastructure - A 20.6 M Long Power Grid, E. Dismantling / Demolition Of Small Architectural Structures, Surfaces And Development Elements Intended For Removal / Relocation, Removal And Disposal Of Objects And Remains After Demolition, F. Earthworks Including Trenching For The Designed Structures Of Hardened And Shock-Absorbing Surfaces And Excavations For The Foundations Of Small Architectural Structures Together With The Removal Of Garbage And Post-Demolition Elements Found In The Ground, G. Preparation Of The Ground For The Designed Surfaces And Foundation Of Objects, Soil Treatment/Replacement, Mechanical Compaction Of The Soil, H. Placing Concrete Edges In The Outline Of The Designed Surfaces, I. Rearranging Existing Playground Equipment And Small Architecture, J. Foundation And Installation Of New Small Architecture Objects, K. Construction Of A Pedestrian Route With A Mineral Surface, L. Construction Of A Concrete Tile Surface, M. Construction Of A Shock-Absorbing Surface Of Sand And Turf, N. Planting Of Plants, Including Tree Plantings Along With Mulching, O. Fencing The Green Areas With Wooden Posts With A Rope, P. Installation Of New Entrance Gates, Repair And R
|