1. The Subject Of The Order, In The Design And Build Formula, Is The Preparation Of Design Documentation With Making The Necessary Arrangements And Obtaining The Required Decisions, As Well As The Implementation Of Construction Works Related To The Reconstruction Of Municipal Road No. 125510B Along With The Reconstruction Of The Bridge Over The Biebrza River. The Project Will Include A Section Of Municipal Road No. 125510B From Km 1+540 To 1+915 In The Scope Of Reconstruction Of The Access Roads To The Bridge At Km 1+540÷1+700 And 1+775÷1+915 Over A Length Of 300 M And Reconstruction Of The Bridge Over The River. Biebrza Located At Km 1+700÷1+775, 75 M Long, Near The Town Of Osowiec - Wiedza. The Investment Is Located In The Podlaskie Voivodeship, Moniecki County, Goniądz Commune.2. As Part Of The Task, The Following Elements Should Be Designed And Performed, In Accordance With Applicable Technical And Construction Regulations: A) In The Scope Of Road Reconstruction: - Demolition Works, - Removal Of Bushes, - Earthworks, - Widening Of The Road, Including The Construction Of Sub-Base And Binding And Wearing Layers, - Construction Of The Road Surface In The Area Of Excavation Of The Bridge Abutments, - Supplementing The Roadsides With Crushed Aggregate, - Island Speed Bumps, - Barriers Energy-Consuming On The Approaches To The Bridge, - Vertical And Horizontal Markings, - Road Lighting On The Approaches To The Bridge. B) In The Scope Of Reconstruction Of The Bridge: - Temporary Supports To Protect The Steel Structure Of The Bridges Supporting Structure, - Anti-Corrosion Protection Of The Bridges Supporting Structure, Md-33 Steel Structure, - Removal Of Bushes, - Earthworks, - Demolition Works Of The Bridge With Cutting Of Piles On Land And Under Water, - 2 Abutments Made Of Steel Pipes Topped With Steel Sheets, - Reinforced Concrete Rear Walls Of The Abutments, - Reinforced Concrete Transition Slabs, - 3 Double-Row Pile Yokes Made Of Steel Pipes Filled With Reinforced Concrete, With Struts And Tongs In The Form Of U-Shaped Sections And Steel Caps In The Form Of I-Beams, - 3 Triangular Steel Heads - Piles Made Of Steel Pipes Filled With Reinforced Concrete, Tongs With Channels, Steel Sheet Covering, - Renovation Of Steel Bearings, - A Platform In The Form Of Lower And Upper Decks Made Of Wooden Logs Attached To The Arranged Wooden Crossbars, - Demolition Of The Bridge With Cutting Of Piles On Land And Under Water, - Sidewalks On The Bridge Made Of Wooden Logs, - Protection Of The Cones With Concrete Slabs, - Anti-Corrosion Protection Of Steel Bridge Railings, - Reconstruction Of Energy-Absorbing Barriers Attached To The Railings, - Assembly Navigation Markings For The Duration Of The Bridge Reconstruction And Its Operation, - Reconstruction Of Stairs For The Bridge, - Construction Of Permanent Benchmarks.3. A Detailed Description Of The Subject Of The Order Is Included In The Functional And Utility Program (Pf-U) Constituting Annex No. 9 To The Swz.
|