|
1. The Subject Of The Order Is An Investment Task Entitled: Reconstruction Of Sanitary Facilities Next To The Gymnasium At The Bolesław The Brave Primary School No. 4 In Goleniów, Including The Execution Of All Works Leading To A State Consistent With The Design Documentation, Technical Specification For The Execution And Acceptance Of Construction Works, Swz And The Draft Provisions Of The Public Procurement Contract.2. The Scope Of The Order Includes The Execution Of Construction Works Consisting In The Comprehensive Renovation/Reconstruction Of Sanitary Rooms In The Building Of Primary School No. 4. Bolesława Chrobrego, Located At Ul. Szczecińska 36 In Goleniów. The Building Is Currently Used For Its Intended Purpose. The Sanitary Rooms Covered By The Subject Of The Order Are Located On The Ground Floor, In Part Of The Gymnasium Building. The Walls And Floors Are Tiled, And The Ceilings Are Painted White. The Rooms Are Naturally Lit With Pvc Windows And Artificial Lighting. Attention! The Design Documentation Attached To The Swz By The Ordering Party Covers The Entire Scope Of Works Related To The Renovation Of Sanitary Rooms In The Building Of Primary School No. 4. Bolesława Chrobrego In Goleniów At Szczecińska 36. The Scope Of The Order Excludes Sanitary Facilities In The Main School Building, Which Were Renovated In 2022-2023. Therefore, This Scope Is Not Subject To Valuation And Implementation As Part Of This Procedure.2.1 The Scope Of The Subject Of The Order Includes: 1) General Construction Industry: - Dismantling Partition Walls And Casing Made Of Plasterboards, - Dismantling Internal Door Joinery, - Tearing Off Tile Floors, - Tearing Off Wall Coverings Made Of Tiles, Removing Plaster From Walls, - Dismantling Sanitary Equipment, - Disassembly Of All Installations In The Bathroom Outline, Construction Of Brick Partition Walls And Partitions Made Of Hpl, Construction Of Waterproof Insulation, Construction Of Chimneys, Risers And Levels Of Installations In Bathrooms, Installation Of New Internal Door Joinery, Pouring Floors Under Tiles In Bathrooms And Laying Tiles, Laying Tiles On Walls, Installation Of New Installations And Industry Devices (Installations Sanitary, Electrical), Installation Of Sanitary Equipment2) Sanitary Industry: Dismantling Works, Modernization Of Cold And Hot Utility Water Installations, Modernization Of Sanitary Sewage And Condensate Installations, Modernization Of Sanitary Sewage And Condensate Installations, Sanitary Sewage And Condensate Installations, Modernization Of Fire Protection Water Installations, 3) Electrical Industry: Modernization Of Installations Lighting, - Modernization Of The Power Installation - Power Supply For Devices.2.2 Carrying Out Noisy And Burdensome Works, Except For Days Free From Teaching Classes, Will Be Possible After 13/00/3. A Further Detailed Description Of The Subject Of The Order Is Specified In The Order Documents.
|