1) Preparatory And Demolition Works: A) Preparation And Protection Of The Area, B) Demolition, Earthworks, Reinforcement Of The Existing Wall, C) Shaft Construction, D) Shaft Insulation, Painting, Roofing, Insulation, E) Waste Disposal, F) Dismantling Of The Existing Lift For Disabled People, G) Dismantling Of The Existing Sign On The Facade. 2) Adaptation And Construction Works: A) Delivery, Assembly And Approval For Use Of The Lifting Device, B) Construction Of A Roof Over The Entrance, C) Covering The Roof Over The Entrance To The Elevator, Balustrade, D) Entrance Area - Repair Of The Facade, Entrance Door, Paving Stones, Landscaping, E) Reconstruction Of The Rainwater Drainage System, F) Installation Of A New Spatial Inscription And Repainting The Front Wall On Which The Inscription Was Located, G) Replacement Of Internal And External Joinery Door Along With Accompanying Works, H) Construction Of Electrical Installation In The Scope Of The Rebuilt Part.3. A Detailed Description Of The Subject Of The Order And The Scope Of The Planned Works Are Included In The Annexes To The Terms Of Reference: A) Design Documentation - Annex No. 6 To The Swz;4. Construction Works Will Be Performed In An Active Facility, And Therefore Require Special Caution In Carrying Out The Work, In Particular The Use Of Appropriate Safeguards And Shields To Enable The Facility To Function And Keep The Work Area In Good Order. The Contractor Is Obliged To Carry Out The Works In Such A Way As Not To Disturb The Operation Of The Facility And To Ensure The Safety Of Third Parties. Throughout The Duration Of The Contract, Safe Access To The Building For Employees And Clients Of The Center, As Well As Continuity Of Utility Supply, Must Be Ensured. Any Necessary Shutdowns Of The Energy Supply, As Well As The Shutdown Of Water Devices. - Ch. And Works That Are Noisy And Burdensome To The Surroundings And May Cause Difficulties In The Operation Of The Facility Should Be Carried Out After Prior Consultation With The Ordering Party. 5. The Ordering Party Allows For The Possibility Of Introducing Replacement Works In Relation To The Works Provided For In The Design Documentation, If Their Implementation Turns Out To Be Justified For Technical, Technological, Functional Or Economic Reasons (Not Resulting In Costs Of Increasing The Subject Of The Contract), As Well As In The Event That Circumstances Are Revealed During The Implementation Of The Works That Could Not Have Been Predicted At The Stage Of Preparation Of The Procedure. Replacement Works May Be Introduced Provided That: They Do Not Change The General Nature Of The Contract, They Lead To Achieving A Functional And Usable Effect Not Worse Than That Specified In The Design Documentation, Their Introduction Is Approved By The Ordering Party And The Designer Supervising The Author, The Scope And Value Of The Replacement Works Will Be Specified In The Report And Settled In Accordance With The Provisions Of The Contract. The I
|