|
Installation Of Doors And Windows – P2/P4 Partial General Renovation Of The Wolfratshausen Secondary School - Renovation And Conversion Of The Main Building A With Expansion To 34 Classes Plus An Alternative Room And New Construction Of A Gymnasium Unit - P2/P4-15A Windows/Doors Made Of Wood. The Bad Tölz - Wolfratshausen District Intends To Expand The Isar-Loisach Secondary School In Wolfratshausen (Building A) To A Total Of 34 Classes, Taking Into Account A Comprehensive Energy-Related Renovation, And At The Same Time To Build A New Simple Sports Hall As A Wu Component With Six Classrooms Above In Wooden Modular Or Hybrid Construction. For This Purpose, The Services P2/P4-15A Windows/Doors Wood Ba 3.1 Are Requested Here In Ba 3 For The Renovation And Expansion. Essentially, The Following Services Must Be Provided: - Wood-Aluminum Window, 2700 X 1680 Mm, Fixed Glazing, Fall Protection: 3 Pieces - Wood-Aluminum Window, 2850 X 1680 Mm, Fixed Glazing, Fall Protection: 8 Pieces - Wood-Aluminum Window, 2-Part, 1-Wing, D-Window, 1680 X 1540 Mm: 4 Pieces - Window Wood-Aluminum, 2-Part, 1-Leaf, D-Window, 2850 X 1540 Mm: 14 Pieces - Exterior Door Wood-Aluminum, Block Frame, 1-Leaf, 1260 X 2635 Mm: 1 Piece - Exterior Door Wood-Aluminum, Block Frame, 1-Leaf. With Side Panel, 2010 X 2500 Mm: 1 Piece - Wooden Door, Hpl, Wooden Block Frame, Side Light, Ssk 2, 1-Leaf, 1635X2260 Mm: 6 Pieces - Wooden Door, Hpl, Wooden Block Frame, 1-Leaf, 1135X2260 Mm: 2 Pieces - External Window Sills, Aluminum: 81 M - External Blind System 2850 X 1680 Mm: 11 Pieces - External Blind System 2850 X 1540 Mm: 18 Pieces - Wooden Door, Hpl, T30-Rs, Ssk 2, Steel Frame, 1-Leaf, Approx. 1010X2135 Mm: 2 Pieces - Wooden Door, Hpl, Steel Frame, 1-Leaf, 1010X2135 Mm: 5 Pieces - Steel Door, T30/T30-Rs, 1-Leaf, 1010X2010 Mm: 2 Pieces
|