Parts Of Hydraulic Power Engines Or Motors – Adapted Procedure. The Object Of The Contract Is: A Firm Phase Of Supply Of One Set + An Additional Emergency Power Station And An Optional Phase Of Supply Of 2 Sets - Carry Out Design Studies And Associated Plans For The Sets Of Oil-Hydraulic Power Plants + Oil-Hydraulic Motors + Clutches Based On The Technical Specifications Given, Including An Additional Emergency Power Plant Also Required In A Firm Phase - Draw Up A Quality Assurance Plan - Manufacture / Test In The Factory / Deliver To An Integrator / Attend Empty Workshop Tests / Attend The On-Site Tests Under Load, Of The Present Sets Of The 3 New Operating Bodies Of The Evcrd, Including The Emergency Central Unit - Supply And Equip With Factory Accessories And Sensors - Provide A Batch Of Spare Parts And Consumables - Provide Up-To-Date Plans As Built, Reports, Minutes, Administrative And Technical Documents (Paq) Of Manufacturing And Testing In An End-Of-Business File - Provide A Guarantee And Ensure Its Continuity Between The Different Testing Phases These Reducers Are Designed And Manufactured To Be Equipped On Operating Skids Themselves Intended To Control The Safety Devices Of A Hydroelectric Dam, In 2 Phases: During The 1St Phase Of The Project Between May 2026 And November 2027: Replacement Of The Operating Devices On The Right Bank Flood Evacuator Valve N°3 (Evcrd3) Supply The Entire Firm Section And The Emergency Power Plant (Between July 2026 And March 2027): -Studies, Plans And Paq - Factory Manufacturing - Factory Tests - Delivery To An Integrator - Participation In Empty Tests In The Integrator Workshop: Components Installed On Maneuvering Skid - Participation In On-Site Load Tests: Components Installed On Maneuvering Skid Integrated On Evcrd3 - Study File, Paq, Plans Updated As Built - 24-Month Warranty 2Nd Phase Of The Project Between November 2027 And February 2029 On Levcrd2 And Levcrd1 Simultaneously Supply The Two Sets Of The Optional Tranche (Between November 2027 And July 2028): - Integrate The Rex Of Phase 1 - Update Studies, Plans And Paq - Factory Manufacturing - Factory Tests - Delivery To An Integrator - Participation In Empty Tests In The Integrator Workshop: Integrated Components On Maneuvering Skids - Participation In On-Site Load Tests: Integrated Components On Integrated Maneuvering Skids On Evcrd2 And 1 - Study File, Paq, Plans Updated As Built - 24 Month Warranty
Contact Information
Address
1 rue Louis Renault - -
Contact No.
0561171598
Email
camille.lignieres@shem.engie.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111155204
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.