Mechanized Soil Cleaning: Service Performed With The Use Of Appropriate Machines And Equipment, Suitable For Large Areas Without Access Restrictions, Allowing Greater Agility In The Removal Of Loose Materials, Vegetation And Debris. It Is Mainly Used In Earthmoving, Filling And Soil Preparation Services Where The Available Space Allows For The Safe Operation Of Equipment. It Consists Of Removing Loose Materials, Vegetation And Other Obstacles, Ensuring Adequate Preparation Of The Base For Carrying Out The Work., Filling With Crushed Stone: Ballast With Granular Material, Applied To Floors Or Slabs On The Ground, Thickness Of *5 Cm*., 1:3 Mix Mortar (In Volume Of Cement And Medium Damp Sand) For Subfloor, Preparation Mechanic With 600 L Concrete Mixer: Preparation And Application Service Of 1:3 Mortar Mix (In Volume Of Cement And Medium Damp Sand) For Laying The Subfloor, Produced Mechanically In A 600 L Concrete Mixer, Ensuring Adequate Homogenization Of The Mixture. Includes The Supply Of Materials, Operation Of The Concrete Mixer, Transportation Of The Mortar To The Application Site, Spreading, Thickening And Battening, Ensuring A Uniform Surface Ready For Subsequent Stages, In Accordance With Project Specifications And Current Technical Standards., Execution Of A Sidewalk (Sidewalk) With Cast-In-Place Concrete, Machined, Stamped Finish, Thickness 6 Cm, Reinforced: Service Intended For The Construction Of Public Sidewalks In Machined Concrete, Cast In Situ, With A Thickness Of 6 Cm, Stamped Finish And Reinforced With Steel, To Withstand Greater Efforts. Suitable For Vehicle Entrances And Places Subject To Traffic With Higher Loads, Guaranteeing Resistance, Durability And Compliance With Applicable Technical Standards, 03/30/2026 - 15:34:53, Pvc Pipe, R Series, Rainwater, Dn 100 Mm, Supplied And Installed In Forwarding Branch: Supply Service And Installation Of R Series Pvc Pipe For Rainwater, Intended For Execution Of A Routing Branch, Including Cutting, Adjusting, Cleaning And Laying The Parts, Assembling The Joints, Preparing The Support Cradle, Backfilling And Compacting Around The Pipe. It Also Covers The Alignment And Leveling According To The Project, Ensuring Watertightness, Continuity Of Flow And Adequate Performance Of The Storm Drainage System., Demolition Of Existing Sidewalks, Without Reuse: Service Carried Out Manually, Intended For The Removal Of Existing Coverings On Sidewalks Executed In An Irregular Manner Or In Non-Compliance With Current Accessibility Standards. The Material Removed Will Not Be Reused And Must Be Properly Disposed Of In Accordance With Applicable Environmental Legislation., Loading, Maneuvering And Unloading Of Rubble In A 10 M³ Dump Truck - Loading With A Hydraulic Excavator (0.80 M³ Bucket / 111 Hp) And Free Unloading: Loading, Maneuvering And Unloading Of Rubble Using 10 M³ Dump Truck, Loaded By Hydraulic Excavator Equipped With 0.80 M³ Bucket And Approximate Power Of 111 Hp. Includes Excavation And Collection Of Material, Filling Of The Truck, Necessary Maneuvers For Positioning And Safe Operation, As Well As Internal Transport And Free Unloading At The Location Indicated By The Location, Ensuring Efficiency, Productivity And Compliance With Regulations.
|