|
Architectural, Construction, Engineering And Inspection Services – Neustadt Naval Barracks, Renovation Of The Fire Hall Building 49, Specialist Planning Of Technical Equipment. Specialist Planning Of Technical Equipment In Accordance With § 55 Hoai, System Groups 1 (Hz I), 2-5 (Hz Ii) And 7-8 (Hziii), Service Phases 2-9, Special Services ________________________________________________________________________________________________ The Fire Hall Or Fire Defense Training Hall (Bad Hall) Is Used For Practical Training In Fire Investigation And Fire Fighting. It Is Used All Year Round As A Training And Education Center (Marine Operational Training Center For Damage Prevention) By The Bundeswehr Navy. In The Fire Hall, Various Real And Realistic Fire Cases Are Produced By The Training Staff And Then Fought Individually By The Training Participants. Due To The Defined Nature Of The Training Program, The Fire Hall Is Not Classified As A Fire Simulation Hall Or Facility. +++++ The Fire Hall (Buildings 49 A And B) Is Operated Using The Following Technical Areas, Some Of Which Are Located In Other Buildings: • Control Room For The System Control And Technical Room, Building 51 • Exhaust Air Purification System, Extension To The Fire Hall, Building 49 (F) • Filter And Dirty Water Treatment, Building 50 +++++ Building 49 Is A Single-Story Building With A Pyramid-Shaped Roof. The Smoke From The Fires Is Collected Via The Roof, Led To The Exhaust Air Purification System And Cleaned There. The Contaminated Water Is Led To Building 50 (Dirty Water Treatment) Via A Pump Station (Between Buildings 49 And 50). The Technology In Building 49 Is Controlled Via The Control Room In Building 51. +++++ The Construction Project Consists Of Different Buildings And Systems, As Well As Several Sections That Are Functionally, Spatially And Economically Separated. The Renovation Includes The Entire Building 49, The Exhaust Air Purification System And All Wastewater Pipes Up To The Wastewater Treatment. The Exhaust Air Purification System Is In Serious Need Of Renovation Or Is Missing; This Needs To Be Checked As Part Of The Measure. The Waste Water Treatment Plant (Building 50) Is Excluded From The Renovation. +++++ For The Technical Equipment Service, System Groups 1-5, 7 And 8 Are Part Of The Contract. Part Of System Group 7 Are The Extinguishing Water Pipes/Extinguishing Water Extraction As Well As The Air Filter System. The Consideration Of The Air Filter System Represents A Significant Proportion Of The Performance In Terms Of Costs. ++++ The Gross Costs Totaling €7,406,929.00 Are Distributed As Follows Among The Respective System Groups: System Group 1: Approx. €28,893.00, System Group 2: Approx. €323,355.00, System Group 3: Approx. €247,127.00, System Group 4: Approx. €253,275.00, System Group 5: Approx. €91,720.00, System Group 7: Approx. €6,185,924.36, System Group 8: Approx. €276,635.00. +++++ The Extent Of The Renovation Of The Fire Hall, Building 49, Results From The Condition Assessment. Components Here Include Damaged, Contaminated, Corroded And Deformed Components, Such As The Roof Covering. In Addition, Must
|