|
Work Sign 4.00 Af_04/2019 (Recape)Surface Cleaning With High Pressure Jet. Af_04/2019 ( Recape ), Bonding Paint With Rr-1C - Exclusive Emulsion - Rr1c Rate - 0.0005Bonding Paint With Rr-1C - Exclusive Emulsion - Rr1c Rate - 0.0005, Supply Of Rr-1C Emulsion - Bonding Paintsupply Of Rr-1C Emulsion - Painting Connection, Cbuq - New Traces - Trace 4 - Range C - (Quant. Less Than 10,000 Ton) - Cap Rate - 0.047Cbuq - New Traces - Trace 4 - Range C - (Quant. Less Than 10,000 Ton) - Cap Rate - 0.047, 03/25/2026 - 15:18:29, Cap Supply - Cbuq (Quantity Less Than 10,000 Ton)Cap Supply - Cbuq (Quantity Less Than 10,000 Ton), Cbuq - New Traces - Trace 5 - Range C - Asphalt Concrete With Polymer - Cap: 55/75E. - (Quantity Less Than 10,000 Ton) - Cap Rate 0.0450Cbuq - New Traces - Trace 5 - Range C - Asphalt Concrete With Polymer - Cap: 55/75E. - (Quant. Less Than 10,000 Ton) - Cap Rate 0.0450, Supply Of Cap-50/70 With Elastomeric Polymer (55/75)Supply Of Cap-50/70 With Elastomeric Polymer (55/75), Cbuq - New Traces - Trace 4 - Range D - (Quant. Less Than 10,000 Ton) - Cap Rate - 0.052Cbuq - New Traces - Trace 4 - Range D - (Quant. Less Than 10,000 Ton) - Cap Rate - 0.052, Cbuq - New Traces - Trace 6 - Range F - Reprofiling - (Quant. Less Than 10,000 Ton) - Cap Rate - 0. 054Cbuq - New Traces - Trace 6 - Range F - Reprofiling - (Quantity Less Than 10,000 Ton) - Cap Rate - 0.054, Continuous Cold Milling Continuous Cold Milling, Horizontal Signaling Strip With Solvent-Based Acrylic Resin Paint - (0.034 M2/M2) Range Horizontal Signage With Solvent-Based Acrylic Resin Paint - (0.034 M2/M2), Reflective Signage-Circle Plate (0.1964 M2/Ud) + Metallic Supportreflective Signage-Circle Plate (0.1964 M2/Ud) + Metallic Support, Reflective Signage-Triangle Plate (0.1219 M2/Ud) + Metallic Support For Reflective Signage Plate-Triangle (0, 1219 M2/Ud) + Metallic Support, Reflective Signage Plate-Octagon (0, 2160 M2/Ud) + Metallic Support For Reflective Signage Plate-Octagon (0, 2160 M2/Ud) + Metallic Support, Signage Plate Reflective-Rhombus (0, 2025 M2/Ud) + Metallic Supportsignage Plate Double Reflective-Rectangular (Two De-0, 2400 M2/Ud) + Metallic Support, Bituminous Binder Application Rate Control Testbituminous Binder Application Rate Control Test, Bitumen Percentage Test - Bituminous Mixturesbitumen Percentage Test - Bituminous Mixtures, Degree Of Compaction Control Test Of The Asphalt Mixturecontrol Test Of The Degree Of Compaction Of The Asphalt Mixture, Bituminous Material Density Testbituminous Material Density Test, Extraction Of Asphalt Concrete Specimen With Rotating Probeextraction Of Asphalt Concrete Specimen With Rotary Probe, Mobilization And Demobilization Of Equipment And Team For Extraction Of Specimens From The Asphalt Layer - (For Every 25 Cps Extractions Corresponds To 1 Mobilization) Mobilization And Demobilization Of Equipment And Team To Extract Specimens From The Asphalt Cover - (For Every 25 Cps Extractions
|