1. The Subject Of The Order Is The Renovation Of Floors, Walls And Ceilings In Rooms, Renovation Of Walls And Ceilings In Sanitary Facilities On The 1St And 2Nd Floors, Renovation Of Walls And Ceilings In The Corridors On The Ground Floor And 1St Floor, Together With The Replacement Of Lighting And Replacement Of Windows In The Staircase In The Secondary School Complex No. 3 In Jaworzno, Ul. Północna 9A. The Scope Of The Renovation Includes: - Walls, Ceilings - Classrooms No. 30 And 40, Common Room, Hall, Corridor On The Ground Floor And First Floor, Staircase From The Ground Floor To Second Floor, Mens Toilets On The First And Second Floors, - Floors - Classrooms No. 29, 30 And 40, Common Room, Hall, - Electricity - Mens Toilet On The First And Second Floor, Corridor On The Ground Floor And First Floor, Corridor Next To The Cloakrooms, Hall, Common Room, Room No. 30, Staircase - Replacement Of Doors - Corridor Next To The Office, Mens Sanitary Room On The 1St And 2Nd Floor, Room 30, Corridor Next To The Gymnasium, Gymnasium, Cloakrooms, - Replacement Of Windows - Staircase. Painting Walls And Ceilings: Scraping And Washing Off Old Paint, Removing Stains, Wiping Existing Ones Plasters, Preparation Of Surfaces For Painting With Emulsion Paints, Priming Substrates, Two-Time Painting With Emulsion Paints, Two-Time Painting With Oil Paints And One-Time Filling, Two-Time Painting Of Strips Up To 20 Cm With Oil Paints, Carving Grids Out Of The Wall And Installing Grids, Securing Floors With Foil, Protecting Windows With Foil, Painting Radiators, Grates And Rods Twice With Oil Paint. Carpeted Floors Pvc: Demolition Of Plastic Floors, Milling Of Floor Surfaces, Leveling Of Subfloors, Demolition Of Plinths, Repair Of Cracks, Making Leveling Layers For Floors, Priming Subfloors, Making Floors With A Homogeneous Carpet. Door And Window Joinery: Dismantling Door Leaves, Replacing Thresholds, Carving Wooden Door Frames Out Of The Wall, Replacing Door Joinery With Aluminum Doors, Repairing Unevenness, Sealing With Polyurethane Foam, Completing Internal Plasters At The Openings Of The Replaced Doors, Filling And Smoothing Out Unevenness, Repainting With Emulsion Paint And Paneling With Oil Paint, Installation Of Steel Door Frames And Internal Door Leaves And Their Adjustment, Installation Of Threshold Strips At Doors, Disassembly Of Windows, Removal Of Plasters On External And Internal Jambs, Removal Of Unevenness, Bricking Up And Bricking Up Window Openings, Preparation Of Surfaces For Insulation, Insulation Of Walls In Place Of Brickwork, Execution Of External Plasters, Installation Of Sheet Metal Flashings, Removal And Disposal Of Rubble. Other Construction Works: One-Time Painting Of Door Frames, Installation Of Fenders, Plaster Additions, Replacement Balustrade Posts, Construction Of Gaps At The Landing, Installation Of Cable Trays, Replenishment Of Plaster After Dismantling Fenders And Roller Shutters, Lamps, Dismantling Of Tile Coverings, Stripping And L
|