1. Task 1 - Partial Renovations Of Bituminous Surfaces, Including: On: - Partial Renovation Of Bituminous Surfaces With Mineral-Asphalt Mixtures, - Repair Of Bituminous Surfaces With Cold Bituminous Mixtures, - Filling Of Defects In The Road With Crushed Stone, - Construction Of Surfaces With Mineral-Bituminous Mixtures, - Consolidation Of Road Surfaces With Asphalt Or Tar Stabilized With Natural Aggregate, - Surface Consolidation Of The Surface With Asphalt Or Tar, Regeneration And Surface Closure Of Bituminous Surfaces And Repair Of Rakowinia, - Vertical Adjustment Of Inspection And Telephone Wells For Water And Gas Valves And Sewage Grates. The Contractor Will Carry Out Construction Works Using Its Own Materials, Which It Will Purchase And Deliver To The Work Site At Its Own Expense And Risk, And For Which It Has The Legally Required Technical Approvals, Quality Certificates, Certificates, Test Results, Etc. The Cost Of All Materials Used To Complete The Task Will Be Included In The Tender By The Contractor. Remuneration. The Contractor Will Include In Its Offer All Costs Related To The Implementation Of The Subject Of The Contract, In Particular The Costs Of: A) Purchase And Delivery Of Materials, B) Securing And Marking The Work Area And Works Performed On Municipal Roads Where Vehicle Traffic Takes Place, C) Transport To The Construction Site In The Administrative Area Of The Świebodzin Commune Regardless Of The Distance And Loading And Unloading Works, D) Equipping Each Employee Working On Municipal Roads With Warning Clothing (Shirts, Vests, Mark-Ups) In Bright Green Or Orange, E) Employees Remuneration For Work, Income Tax, Social And Health Insurance Contributions, Etc. F) Purchase Of Fuel, Liquids, Oils, Etc. G) Insurance And Repair Of Equipment, H) Civil Liability Insurance In The Scope Of Activities Related To The Subject Of The Contract For A Guarantee Sum Of Not Less Than Pln 50,000.00, I) Removal Of Materials, Rubble And Garbage From The Work Site - If Necessary - In The Price Included Transport To An Entity Dealing With Waste Recovery Or Transport And Storage In A Waste Landfill - Regarding That Part Of Materials That Are Classified As Waste In Accordance With Separate Regulations, J) Tidying Up The Area After The Works Have Been Completed.2. The Detailed Scope Of Construction Works To Be Performed By The Contractor Was Indicated In The Bid Cost Estimate, Constituting Annex No. 1A-1 To The Swz, And Stwior, Constituting Annex No. 9-1 To The Swz.
|