1. The Subject Of The Order Is: The Order Being The Subject Of This Procedure Covers The Execution Of Construction Works, Based On Design Documentation Prepared By The Authors Architecture Studio A Atelier, Arch. Artur Turanta, Consisting Of: Reconstruction And Renovation Of A Service Building At Ul. Karłowicza 17A In Jelenia Góra. At The Time Of Preparation Of This Swz, An Application Was Submitted To The Mayor Of Jelenia Góra For Approval Of The Design Documentation And Granting A Building Permit. The General Scope Of Works Covered By The Order Will Consist In Complete Reconstruction Of The Rooms Indicated In The List. The Planned Investment Task Includes Works Related To The Reconstruction Of Part Of The Building. The Following Construction Works Are Envisaged As Part Of The Contract In Question: - Demolition Works To The Extent Necessary, - Preparatory Works Related To The Organization Of The Construction Site, Preparation Of The Construction Site For Investment, - Demolition And Construction Works Outside, Reconstruction Of The Parking Zone - A Ramp For The Disabled With Access To The Laboratory, Roofing, Hardening The Area Around The Building, - Demolition Works Of External Stairs Along With The Construction Of A Retaining Wall And The Construction Of A Window To The Gymnasium On The Ground Floor, - Works Renovation Works Related To The Renovation, Reconstruction And Change Of Use Of Parts Of The Ground Floors, I, Ii And Iii, - Renovation Works In The Field Of Replacing And Adapting Sanitary, Electrical And Telecommunications Installations Of Parts Of The Ground Floors, I, Ii And Iii, - General Construction Works, - Sanitary Works In The Field Of Central Heating, Water And Sewage, Mechanical Ventilation And Air Conditioning Of Selected Rooms, - Electrical And Low-Current Works Also Related To The Installation Of In The Field Of Fire Protection (According To The Recommendations Of The Expert Opinion) And Access Control In Designated Places, - Liquidation Of The Inspection Well Located On The Ground Floor In The Laboratory Room And Construction Of A New Well Outside The Building, - Adaptation Of The Entrance Zone To The Ground Floor - Ramp, Door Joinery, - Adaptation To The Requirements Of The Rooms For The Needs Of Disabled People In Terms Of Functional Layout, Construction And Installation, - Disassembly Of External Elements Of The Ramp, Platform, Doors And Joinery To The Ground Floor, - Construction Of A Roof Entrance Zone To The Ground Floor, Renovation Of Structural Elements Of Platforms, New Stairs And Ramps, Construction Of New Surfaces, Installation Of Stainless Steel Balustrades With Handrails, Renovation Of The Facade In The Entrance Zone To The Ground Floor, - Disassembly Of Sanitary Ceramics, Radiators, Windows, Doors And Other Worn Elements And Punctures, - Dismantling Of Wall Covers, Suspended Ceilings And Dismantling Of All Finishing Elements Such As Carpets, Tiles, Etc.; - Installation Of New Radiators With Thermostatic Valves
|